My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design Services for Southern Gateway Bridge Beautification Project - Ciorba Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design Services for Southern Gateway Bridge Beautification Project - Ciorba Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2020 10:19:31 AM
Creation date
4/29/2020 10:19:26 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zach Hurst, PE <br />US 20/31 Bridge Aesthetics <br />Page 2 <br />anticipated to be 8 weeks after direction is received regarding which aesthetic option to <br />develop. <br /> Preparation of Stage 3 plans and special provisions addressing comments from Stage 1 plan <br />review. These plans will be included with the INDOT contract submittal. This will follow the <br />INDOT schedule currently targeted for December 18, 2020. <br />Staff Hours <br />Our design engineering services will consist of: <br />Part A <br />Work TaskStaff Hours <br />Prepare Exhibits/Renderings 21 <br />Cost Estimates 3 <br />Video Conference Discussion 2 <br /> <br />Total Staff Hours:26 <br />ENGINEERING FEE <br />Our engineering fee will be as follows: <br />Labor: <br />26 Staff Hours x $48.50 per hour x 2.9 = $ 3,656 <br />In-House Direct Costs: <br />Travel $ 0 <br />Total Engineering Fee $ 3,656 <br />Part B <br />Work TaskStaff Hours <br />Prepare Stage 1 and Stage 3 plans 48 <br />Prepare Stage 3 special provisions12 <br /> <br />Total Staff Hours:60 <br />ENGINEERING FEE <br />Our engineering fee will be as follows: <br />Labor: <br />60 Staff Hours x $48.50 per hour x 2.9 = $ 8,439 <br /> <br />In-House Direct Costs: <br />Travel $ 0 <br />Total Engineering Fee $ 8,439 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.