Laserfiche WebLink
Zach Hurst, PE <br />US 20/31 Bridge Aesthetics <br />Page 2 <br />anticipated to be 8 weeks after direction is received regarding which aesthetic option to <br />develop. <br /> Preparation of Stage 3 plans and special provisions addressing comments from Stage 1 plan <br />review. These plans will be included with the INDOT contract submittal. This will follow the <br />INDOT schedule currently targeted for December 18, 2020. <br />Staff Hours <br />Our design engineering services will consist of: <br />Part A <br />Work TaskStaff Hours <br />Prepare Exhibits/Renderings 21 <br />Cost Estimates 3 <br />Video Conference Discussion 2 <br /> <br />Total Staff Hours:26 <br />ENGINEERING FEE <br />Our engineering fee will be as follows: <br />Labor: <br />26 Staff Hours x $48.50 per hour x 2.9 = $ 3,656 <br />In-House Direct Costs: <br />Travel $ 0 <br />Total Engineering Fee $ 3,656 <br />Part B <br />Work TaskStaff Hours <br />Prepare Stage 1 and Stage 3 plans 48 <br />Prepare Stage 3 special provisions12 <br /> <br />Total Staff Hours:60 <br />ENGINEERING FEE <br />Our engineering fee will be as follows: <br />Labor: <br />60 Staff Hours x $48.50 per hour x 2.9 = $ 8,439 <br /> <br />In-House Direct Costs: <br />Travel $ 0 <br />Total Engineering Fee $ 8,439 <br /> <br />