My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design Services for Southern Gateway Bridge Beautification Project - Ciorba Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design Services for Southern Gateway Bridge Beautification Project - Ciorba Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2020 10:19:31 AM
Creation date
4/29/2020 10:19:26 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
April 15, 2020 <br /> <br />Zach Hurst, PE <br />Project Engineer <br />City of South Bend <br />227 W. Jefferson Blvd. <br />South Bend, IN 46601 <br /> <br />Subject: Letter Agreement for Engineering Services <br /> US 20/31 Bridge Aesthetics <br /> <br />Dear Mr. Hurst: <br /> <br />Ciorba Group, Inc. is pleased to submit this Letter Agreement to provide design engineering <br />services for the above referenced project. <br />Ciorba is currently under contract with INDOT (Contract B-40600, DES 1701538) to provide <br />design engineering services for the full replacement of the bridge at the US 20/31 interchange <br />due to its current condition. Based on coordination with the City of South Bend during the <br />development of design plans, it was determined that various aesthetic treatments should be <br />investigated for application to the bridge. Any aesthetic treatments will be locally funded and <br />paid for by South Bend. <br />During a conference call with South Bend, INDOT and Ciorba on March 20, 2020, it was decided <br />that Ciorba will investigate the following aesthetic treatments on the bridge: <br /> Form liner on bridge parapets and MSE walls including lettering on the bridge rail <br /> Painting of the bridge beams and concrete staining <br /> No lighting will be on the bridge (updated per 4/15 email) <br /> <br />Scope of Services <br />The Scope of Services for the project will include two parts: <br />Part A: <br /> Prepare 1 aesthetic exhibit, renderings, and approximate pricing. These will be submitted <br />to South Bend by April 30, 2020. <br /> One video conference with South Bend to discuss the aesthetic treatments <br />After a review of the aesthetic exhibit and renderings, South Bend will determine if the <br />improvements will be included in the INDOT plans. If South Bend elects to move forward, Part B of <br />the scope will be utilized. If South Bend elects not to move forward, Part B will not be pursued. In <br />order to have this work included in the INDOT plans for letting, a decision will be required by June <br />1, 2020. <br />Part B: <br /> Preparation of Stage 1 aesthetic plans assuming lettering, form liner and painting option. <br />These plans will be submitted to the City of South Bend for review. The submittal is <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.