My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 08-08-86
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1980-1989
>
1986
>
RM 08-08-86
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2012 3:18:44 PM
Creation date
10/1/2012 3:45:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend <br />Regular Me, <br />4. <br />elopment Commission <br />- August 8, 1986 <br />(Cont.) <br />b. Memo from Sandra Parmerlee, Clerk to the Board <br />of Public Works, relating to the Avon Theater <br />brick veneer project bid opening. <br />To: Jon R. Hunt, Director <br />Department of Economic Development <br />From: Sandra Parmerlee, Clerk <br />Board of Public Works <br />Re: Avon Theater Brick Veneer - Bid Openings <br />Date August 5, 1986 <br />The Board of Public Works at their meeting <br />held today received the attached bids for the <br />Avon Theater brick veneer project. This is <br />being referred to you for your review and <br />recornmendation. <br />Mr. iunt noted the following bids received: <br />Rein-.e Construction in the amount of $75,886; <br />Ziol cwski Construction in the amount of <br />$48,580 with a $4,000 deduction alternate; <br />Cast el Construction in the amount of $67,950; <br />and, Slatile Roofing and Sheet Metal in the <br />amouit of $73,100. After reviewing and <br />disc ssing the bids with the City Engineer, <br />John Leszczynski, it is the staff's <br />reccimiendation that the Commission accept the <br />Ziol owski Construction bid in the amount of <br />$48,580 since it is the lowest and best bid. <br />Upon a motion made by Mr. Combs, seconded by <br />Mr. Donoho and unanimously carried, the <br />Commission authorized the Board of Public <br />WorkE3 to award a bid to Ziolkowski <br />Construction Company in the amount of $48,680 <br />for epair of the party wall on the Avon <br />Thea er based on the recommendation.of the <br />City Engineer based on the lowest bid. <br />c. Memo received from Sandra Parmerlee, Clerk to <br />Board of Public Works, regarding the State <br />Theater reroofing project. <br />To: Jon R. Hunt, Director <br />Department of Economic Development <br />-4- <br />COMMISSION AUTHORIZED THE <br />BOARD OF PUBLIC WORKS TO <br />AWARD A BID TO ZIOLKOWSKI <br />CONSTRUCTION COMPANY IN THE <br />AMOUNT OF $48,680 FOR REPAIR <br />OF THE PARTY WALL ON THE AVON <br />THEATER BASED ON THE RECOM- <br />MENDATION OF THE CITY ENGINEER <br />BASED ON THE LOWEST BID <br />
The URL can be used to link to this page
Your browser does not support the video tag.