My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
713 West LaSalle Avenue_COA 2020-0224
sbend
>
Public
>
Historic Preservation
>
2020
>
Agendas & Packets
>
March
>
713 West LaSalle Avenue_COA 2020-0224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 1:16:08 PM
Creation date
3/10/2020 12:00:25 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
713 West LaSalle Avenue
HPC Document Type
Certification
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
713 W LaSalle AvenueAddress:01 - General ConditionsUnit: <br />General RequirementsLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 1 - <br />Spec Quantity Units Unit Price Total PriceSpec # <br />Trade: 219 Lead Abatement <br />on the site plans included in the Lead Inspection & Risk <br />Assessment Report. <br />LBPGC10 1.00 EABUILDING PERMIT REQUIRED $250.00 $250.00 <br />The contractor is responsible for submitting this owner-prepared <br />work write up to the building department, applying for, paying for <br />and receiving a building permit(s) prior to starting any work. <br />LBPGC11 1.00 DUOWNER RESPONIBILITIES n/a n/a <br />The owner shall provide: <br />1. Utilities and sanitary facilities. <br />2. Remove all personnel items from work area. <br />3. All full and complete access to work areas. <br />4. Allow site access during normal work areas. <br />LBPGC12 1.00 DUSTABILIZE NON-LBP PAINT $500.00 $500.00 <br />Deteriorated non-LBP has been identified in association with the <br />structure. to ensure proper cleaning and prevent lead-dust <br />hazards from non-LBP that contains lead below HUD/EPA <br />regulatory limits, loose paint shall be adequately removed prior <br />to final cleaning. After establishing any required floor <br />containment with polyethylene sheeting, mist defective paint <br />area with water. Aggressively remove all loose paint or <br />deteriorate substrate with a stiff bristled brush or broom. <br />Contractor may elect to: Repair any damaged substrate and <br />spot prime areas of deteriorated non-LBP paint to ensure that <br />paint does not become loose prior to clearance. <br />Project will fail clearance if any paint chips, dust or debris are <br />identified, regardless of source. <br />Location Total:$2,340.00 <br />Page 3 of 25
The URL can be used to link to this page
Your browser does not support the video tag.