My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
713 West LaSalle Avenue_COA 2020-0224
sbend
>
Public
>
Historic Preservation
>
2020
>
Agendas & Packets
>
March
>
713 West LaSalle Avenue_COA 2020-0224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 1:16:08 PM
Creation date
3/10/2020 12:00:25 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
713 West LaSalle Avenue
HPC Document Type
Certification
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
713 W LaSalle AvenueAddress:01 - General ConditionsUnit: <br />General RequirementsLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 1 - <br />Spec Quantity Units Unit Price Total PriceSpec # <br />Trade: 219 Lead Abatement <br />containment area will be cleaned to remove any visible dust and <br />debris, and occupants will have safe access to sleeping areas, <br />a bathroom and kitchen facilities. Occupants will not be <br />permitted to enter the work site during the lead hazard reduction <br />activities until after the lead abatement project has been <br />completed and clearance is achieved. Contractor is responsible <br />for ensuring occupant protection is completed in accordance <br />with HUD rules and regulations. <br />LBPGC07 1.00 ALQUANTITY VERIFICATION n/a n/a <br />The quantities herein expressed within the specification are for <br />informational purposes only. Contractors shall be responsible <br />for obtaining their own quantity schedule. INCAA shall not be <br />held liable for any difference in estimated and actual quantities; <br />therefore, change orders will not be approved for differences in <br />quantities. Contractors shall immediately notify the INCAA <br />during the bidding process if field measurements vary <br />significantly from those estimated within this specification. <br />Contractor's bid shall be reflective of completing specified work <br />to eliminate lead hazards at the project site. <br />LBPGC08 3.00 DUCLEAN TO CLEARANCE $110.00 $990.00 <br />After completion of all lead hazard reduction activities, all work <br />areas shall be cleaned for clearance. Typical work practices <br />include, but are not limited to: wet mist, fold and remove all <br />containment polyethylene sheeting; HEPA vacuum all visible <br />surfaces including walls, floors, ceilings and window troughs <br />from the top down; detergent scrub all horizontal surfaces in <br />small sections using a 3-bucket system, changing rinse water <br />every 250 SF; completely rinse with clean water and new <br />equipment. After surfaces are dry, HEPA vacuum all visible <br />surfaces except ceiling. <br />Contractor may also elect to install new floors, seal horizontal <br />surfaces, paint concrete floors, or utilize other means and <br />methods to ensure lead dust hazards are resolved and <br />clearance is acheived. Any new flooring must be pre-approved <br />by homeowner. <br />The following lead dust hazards were identified in the residence <br />and must be addressed: <br />713 - Apt 1 <br />Room 1 - Living Room - Window Sills <br />Room 3 - Bedroom - Window Sills <br />Room 9 - Laundry - Floor <br />LBPGC09 1.00 EAWALL NAMING PROTOCOLS n/a n/a <br />Walls and attached components shall be identified with the <br />letters A, B, C & D. Wall A is always the wall that is closest to <br />the address elevation or the "street side" of the house. Moving <br />clockwise, the walls are then B, C, D. <br />Windows are provided a numerical number, which is reflected <br />Page 2 of 25
The URL can be used to link to this page
Your browser does not support the video tag.