My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 10-23-81
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1980-1989
>
1981
>
RM 10-23-81
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2012 4:01:30 PM
Creation date
9/26/2012 2:00:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend ledevelopment Commission <br />Rescheduled Regular Meeting - October 23, 1981 <br />6. NEW BUSINESS (continued) <br />j. continued... <br />Since we are at that point, Mr. James Childs, as an <br />architect, has been asked to go through the building, <br />review and give us a report. The report from Mr. <br />Childs is fairly lengthy, so I will summarize it. <br />Mr. Childs' report states that he personally reviewed <br />the original plans, visited the site, and toured the <br />building and grounds. He states that: "due to the <br />magnitude and complexity of the project, a multitude <br />of revisions have occurred in both the plans and <br />specifications and ultimately, of course, meant that <br />the building is somewhat different than originally <br />designed: Even though the revisions are quite exten- <br />sive in nature, it is still our professional opinion <br />that the conceptual scope of the project has remained <br />unchanged, and, therefore, the structure which is <br />bei g completed at this time is in substantial con- <br />forrrance with the plans which were provided to us by <br />your office and which represent the originally sub- <br />mitted document." <br />On a motion made by Mr. Donaldson, seconded by Mr. <br />Cira and unanimously carried, it was determined that <br />the project has been substantially completed in con - <br />for ance with the plans and specifications, as modified, <br />and authorized the execution of the Certificate of <br />Com letion. <br />k. Com ission a <br />Com ittee. <br />)ointment to Monroe - Sample Design Review <br />Mrs. Kolata explained that when the Monroe - Sample De- <br />velopment Plan was adopted, it called for a [design <br />Review Committee to consist of five people: the <br />Executive Director of Redevelopment; the Director of <br />the Area Plan Commission; the Building Commissioner; <br />and the City Engineer. One appointment was left open <br />for the Commission to make, and we are recommending <br />to the Commission that that appointment be made today <br />in light of the fact that we received our first bid <br />proposal for purchase of land in Monroe- Sample. We <br />would like to recommend to you that Mrs. GlendaRae <br />Hernandez be appointed to the Committee. We also <br />would like to recommend that'we expand the working <br />of he Design Review Committee so that we have some <br />people who will serve on the Committee, not as <br />9 <br />COMMISSION AUTHORIZED <br />CERTIFICATE OF COMPLETION <br />FOR RAHN PROPERTIES II <br />(MARRIOTT HOTEL - FIRST <br />BANK CENTER) <br />
The URL can be used to link to this page
Your browser does not support the video tag.