My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/1901 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1901
>
06/1901 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:31:33 PM
Creation date
2/13/2020 10:25:03 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/1/1901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JUNE 25, 1901, 7:15P.M. <br />He aring!as to the amount of assessments and upon -the final estimate for the imp- <br />rovement of George Avenue by curbing and construction of sidewalks- No remonstrators <br />appeared. The assessment roll, .filed .June 7, and the final estimate, allowed Jane 7, are <br />hereby c onf i rme d. <br />Hearing as to the amount of assessments and upon the final estimate for the IMP.- <br />provement of Osborn street by the construction of cement walks and curbs. -No remonstrators <br />appeared. The assessment roll, filed June 7, and the final estimate, allowed June 7, are <br />hereby confirmed. <br />Hearing as to the amount of assessments and upon the final estimate for the Cush- <br />ing street sewer, under Improvement Resolution No. 3. No remonstrators appeared. The ass- <br />essment roll, filed June 10, 19013, and the final estimate, allowed June 10, 1901, are <br />hereby confirmed. <br />Hearing as to the amount of assessments and upon the final esttmate for the Napier <br />street pipe sewer. No remonstrators appeared. The assessment roll, filed June 10, 1901, and <br />the final estimate, allowed June 10, 1901, are hereby confirmed. <br />First hearing on Improvement Resolution No. 25 for grading and constructing cement <br />walks and curbs on Bartlett' street. No remonstrators appeared. The engineer filed the estim- <br />ated cost, $449.61 The board find that the benefits, including the benefits to the City, are <br />equal to the estimated cost of the improvement. Improvement Resolution No. 25 is hereby <br />confirmed. <br />First hearing on Improvement Resolution No 26, for constructing a pipe sewer on <br />Dore Avenue. No remonstrators appeared. The engineer filed the estimated cost, $546.00 <br />The board find that the benefits, including the benefits to the City, are equal to the est- <br />imated cost of the improvement.Improvement Resolution No. 26 is hereby confirmed. <br />First hearing on Improvement Resolution No. 27, for grading South Lafayette street <br />Remonstrators appeared asking to postpone the matter until the street was widened; should <br />be granted. The above improvement resolution is hereby recinded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.