Laserfiche WebLink
III. Revise Sub -Section A.3.a. of Section A1.04 of Exhibit A as follows: <br />a. Engineer shall prepare and submit an IDEM Rule 5 Erosion Control Permit for <br />each construction phase. Engineer shall monitor the approval process and <br />provide customary additional information that may be required to secure the <br />permit. <br />IV. Add Sub -Section A.B. to Section A1.04 of Exhibit A as follows: <br />8. Due to a change in funding, the Engineer shall split the Phase 11 plans to reduce the <br />scope of the project and/or revise the Contract Documents to include bidding the <br />intersection of Colfax Avenue and Studebaker Street as an alternate for the Phase II <br />Project: <br />a. Revise the plans as follows: <br />1) Split the plans along Elm Street to include the work south of Colfax <br />Avenue into a future project. <br />2) The intersection of Colfax Avenue and Elm Street will remain part of <br />Phase 11, which shall include the bump -outs, crosswalks on Colfax <br />Avenue, street lighting in the intersection, drainage structures, <br />pavement markings and signing. <br />3) Revise the plans at the intersection of Colfax Avenue and Studebaker <br />Street to only include new curb ramps and sidewalk connections, <br />removal of the existing guardrail and replacing existing curb in the <br />southwest and southeast quadrants of the intersection to be bid as an <br />alternate with Phase 11 construction. If this work is not constructed as <br />part of Phase 11, the work will be added to Phase 111 Plans along with <br />Elm Street south of Colfax Avenue. <br />4) Modify the plans for the plaza to eliminate brick pavers within Elm <br />Street, brick columns, drywells, lighted bollards, and the concrete <br />header. <br />5) Resubmit revised Final Phase 11 Plans (90%). <br />b. Revise the contract documents, specifications and plans as required to include <br />alternate bids to provide the Owner flexibility in selecting scope items based on <br />the bids to remain within the budget for the project. <br />V. Revise Sub -Section D of Section A1.04 of Exhibit A as follows: <br />D. The number of prime contracts for Work designed or specified by Engineer upon <br />which the Engineer's compensation has been established under this Agreement <br />is � 3. If more prime contracts are awarded, Engineer shall be entitled to an <br />equitable increase in its compensation under this agreement. <br />The additional prime agreement would be for the following: <br />2 of 8 <br />Supplemental Agreement No. 3 <br />