My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 3 to PSA – Design Modifications for Two Way Conversion of Colfax Ave - DLZ Indiana LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 3 to PSA – Design Modifications for Two Way Conversion of Colfax Ave - DLZ Indiana LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:40:52 AM
Creation date
1/29/2020 10:33:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
1/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Phase/1/ Construction of Elm Street south of Colfax Avenue to Washington <br />Street and the intersection of Colfax Avenue and Studebaker Street, if not <br />selected as an alternate for Phase H construction. <br />VI. Add Sub -Section A.20. to Section A1.06 of Exhibit A as follows: <br />20. Monthly Progress Meetings (Hourly Rate) <br />a. Splitting the project into an additional prime agreement extends the life of the <br />project, which will require additional monthly progress meetings. DLZ will develop <br />the agenda, attend and prepare minutes for up to 12 additional monthly progress <br />meetings during the remaining design of this project. <br />(The remainder of this page intentionally left blank) <br />3of8 <br />Supplemental Agreement No. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.