My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 03-02-79
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1979
>
RM 03-02-79
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2012 4:50:46 PM
Creation date
9/24/2012 4:16:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South BendlRedevelopment Commission <br />Regular Me ting - March 2, 1979 <br />6. NEW <br />C. <br />1I <br />INESS (Continued) <br />ssion approval re <br />Maintenance Co., <br />08.00. for an ame <br />at Ithe address of 1414 E. <br />letter from Mr. James Harc <br />ed for Change Order #2, Charles <br />an increase in contract price <br />ract total of $3,053.00, <br />Street, as set forth in <br />irector. Bureau of Housing. <br />Th ( original contract for 1414 E. Sorin specifies instal- <br />lation of a cylindrical lockset in a living room door and <br />• deletion of this item is recommended. While performing <br />• Irogress inspection the bureau also observed the following: <br />1) kitchen cabinet doors were not closing and catches should <br />be installed; (2) installation of underlayment and tile would <br />be appropriate to small side door landing which is showing <br />wear and beginning to chip. This landing exists adjacent to <br />a hallway and kitchen where surfaces are specified to be <br />re fled; (3) living room evidenced water damage and should <br />be repaired. The roof had been serviced under a prior <br />eme,Tgency contract. Change Order #2 reflects these recommen- <br />ds ions and increases contract by $108.00. <br />Mr Robinson made a motion to approve Change Order #2, with <br />Charles Brown Maintenance Co., for an increase in contract <br />price of $108.00, seconded by Mr. Donaldson, and the motion <br />was unanimously carried. <br />Coinnission zipproval requested for Change Order #3, Charles <br />Brown Maintenance Co., Inc. for an increase in contract <br />nice of $177.00, for an amended contract total of $5,807.00 <br />at the address of 1214 E. Cedar Street, as set forth in <br />letter from Mr. James Harcus. Director, Bureau'of Housing. <br />Original contract for 1214 E. Cedar Street specified replace- <br />ment of deteriorated base cabinets. It was discovered that <br />wa 1 units are interlocked with base cabinets and would <br />collapse if the base was removed (the result of prior <br />handyman's inventiveness). Change Order ##3 records an <br />ad ition to the contract of two (2) wall cabinets which <br />re ults in a $177.00 increase to the contract. <br />CHANGE ORDER #2 <br />CHARLES BROWN <br />MAINTENANCE CO., <br />INC. APPROVED <br />CHANGE ORDER #3 <br />CHARLES BROWN <br />MAINTENANCE CO. <br />INC. APPROVED <br />Mr. Robinson made a motion to approve Change Order #3, Charles <br />Brown Maintenance Co., Inc. for an increase in contract price <br />of $177.00, seconded by Mr. Donaldson, and the motion was <br />unanimously carried. <br />e. Commission approval requested for Change Order #1, Charles CHANGE ORDER #1, <br />Brown Maintenance Co., Inc. for an increase in contract CHARLES BROWN <br />K r ce of 295.00, for an amended contract total of MAINTENANCE CO., <br />074.00, at the address of 1036 N. Talbot, as set forth INC. APPROVED <br />in letter from Mr. James HArcus, Director, Bureau of Housing. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.