South Bend Redevelopment Commission <br />Regular Meeting - October 7, 1977 <br />6. NEW BUSINESS (CONT'D <br />c. Mr. Brownell described Change Order #2 to Contract No. CS -3/10 <br />with Plaia Construction Company, for an increase in contract price <br />of $715.00 (for an amended contract total of $55,638.00). Change <br />Order calls for installation of ceiling tile in the kitchen, 144 sq. ft. <br />or $350.00. On the rear porch, installation of 3 risers, three cast <br />steps, including 3 ft. metal handrail and replace the block support <br />post footings ($421.00); for a total of $771.00 addition. There is also <br />deletion of $56.00 for painting of the kitchen ceiling, for a net <br />change order of $715.00. Mr. Wiggins asked if the leak occurred after <br />he new bathtub was installed? Mr. Johnson replied, "no, the plumber <br />had previously prepared the necessary drain under the tub to stop the <br />leak." At this time Mr. Crighton spoke, "the reason for these many change <br />orders is because the bidding procedure was changed. At times we were <br />lucky to get six or seven a month awarded, and we had over eighty <br />awarded in three months; that makes a rather substantial difference in <br />he number of contracts that we are handling on a day to day basis. Our <br />volume has increased, more than tripled." Mr. Wiggins moved approval, <br />seconded by Mr. Donaldson, and carried. <br />d. Mr. Brownell described Change Order #2 to Contract #CS -3/10 with <br />tickler Plumbing for an increase in contract price of $115.00 (for <br />an amended contract of $9,127.00). The change order asked for replacement <br />of a water closet. Mr. Robinson moved approval, seconded by Mr. Wiggins, <br />and carried. <br />e. Mr. Brownell described Change Order #1 to Contract #NECD /2, with Owens <br />Heating Company, for an increase in contract price of $100.00 (for an <br />mended contract total of $8,800.00). This change order asked for <br />I substitution of an oil furnace to replace a gas furnace at a cost <br />f an additional $100.00, due to the fact that a gas furnace cannot be <br />nstalled without the insulation. Mr. Wiggins moved approval, seconded <br />v Mr. Cira and carried. <br />f. Mr. Brownell described Change Order #1 to Contract #NECD /PR /CS -2/15, with <br />Owens Heating Company, for an increase in contract price of $100.00 (for <br />an amended contract total of $6,346.80). An oil furnace was to replace <br />as furnace (as mentioned in 6.e. above). Mr. Robinson moved approval, <br />seconded by Mr. Wiggins and carried. <br />Ir. Brownell described Change Order #NECD /3B, with R. A. Stickler Plumbing, <br />'or an increase in contract price of $177.00 (for an amended contract <br />total of $5,637.00). The change order is for removal of subfloor under <br />:he bathtub and around the water closet. This will cost $89.00 and the <br />iew soil line will cost $88.00, a combined total of $177.00. Mr. Wiggins <br />loved approval, seconded by Mr. Robinson and carried. <br />5 <br />