My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 10-15-76
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1976
>
RM 10-15-76
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2012 9:04:59 AM
Creation date
9/24/2012 11:58:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. NEW BWSINESS (font'd <br />The additions are: <br />Kitchen Sink: Reseat the fixtures and install shut- <br />off valves, install a P -trap $ 73.00 <br />Bathroom Lavatory: Reseat the fixtures and install <br />shut -off valves 45.00 <br />118.00 <br />Deletions are: <br />Kitchen Sink: Replace sprayer and P -trap $1.18.00 <br />On motion by Mr. Wiggins, seconded by Mr. Cira and carried, the <br />above Change Order was approved. <br />4 ) Change Order No. 1 t Contract NWCD /PR /CS -1/07: This is for an <br />increase in contract amount of $949.00, amending contract amount <br />of $6,396.00 to amended contract total of: $7,345.00 for re- <br />habilitation work at 537 North Cleveland Avenue. <br />Mr. Brownell read Mr. Pfeifer's memorandum dated October 11, <br />1976, which stated the specification called for painting the <br />upper and lower cabinets and installing a double bowl stainless <br />steel sink. This cannot be done due to the insufficient width <br />of the base cabinets. The cabinets are homemade and of non- <br />professional caliber. Also, the kitchen floor has a 4'x4' area <br />of missing floor tile. The foundation is allowing water to enter <br />the basement and must be tuck - pointed. The side exterior door <br />needs a pane to keep out the elements. Staff recommended this <br />contract be amended to include the above items and the Change <br />Order be approved. <br />Additions are: <br />Kitchen Cabinets: Scrape and paint upper cabinets <br />two coats and install 10' 2" of base <br />cabinets $511.00 <br />Kitchen Floor: Install 3/8" tempered masonite <br />and tile using waterproof adhesive 272.00 <br />Foundation: Tuck - point the foundation on the <br />southwest, northwest and southeast sides <br />of the structure 180.00 <br />Exterior Side Door: Replace pane 18.00 <br />Total .......................... $981.00 <br />Deletions are: <br />Kitchen Cabinets: Scrape and paint upper and <br />lower cabinets two coats -32.00 <br />Increase in contract amount ..... $949.00 <br />Mr. Wiggins made the motion to approve the Change Order. <br />Ms. Derbeck, South Bend Tribune Reporter, asked why the inspectors <br />didn't notice these things before; how could they miss the floor <br />tiles, for instance? Mr. John Davis, Project Director, Northwest <br />Bureau of Housing, replied when they inspected the house, the tiles <br />- 10 - <br />CHANGE <br />ORDER <br />NO. 1 TO <br />CONTRACT <br />NWCD /PR/ <br />CS -1/07 <br />TABLED FOR <br />NEXT COM- <br />MISSION <br />MTG., NWCD <br />HOUSING <br />PROGRAM <br />
The URL can be used to link to this page
Your browser does not support the video tag.