Laserfiche WebLink
6. NEW 3USINESS (Cont'd <br />f. <br />am <br />Urban Renewal Project, Indiana R -57, for Parcel No. 34 -9B, to <br />Will Roy James, in amount of $200.00. <br />Mr. Wiggins moved for the adoption of Resolution No. 529, seconded <br />by Mr. Donaldson and carried. <br />Change Order No. 2 to Rehabilitation Contract No. 53, in Southeast <br />Code Enforcement Project E -7: Approval was requested for this <br />Change Order with Barany Sheet Metal & Heating Company, for an <br />increase in contract amount of $55.00, (Contract: $4,721.00), <br />to amended contract amount of: $4,776.00, with no change in <br />contract time,.for rehabilitation work at: 622 East Broadway <br />Street. <br />The change order is to replace the lavatory faucets and to repair <br />the bathtub drain. The lavatory faucets are not repairable and <br />if the tub drain were allowed to continue to leak, it would ruin <br />the ceiling below. This work is at a cost of $85.00, and the <br />$30.00 cost for reseating the fixtures is deleted, leaving a <br />cost of $55.00 additional to the contract. <br />The Chair asked Mr. Schaller if he had any further comment to <br />make on this item, and Mr. Schaller advised this is one of the <br />three contracts left to be completed in the E -7 Program. <br />Motion was made by Mr. Wiggins, seconded by Mr. Cira and carried, <br />for the approval of Change Order No. 2 to Rehabilitation Contract <br />No. 53, for an increase in contract amount of $55.00, with <br />Barany Sheet Metal & Heating Company, and amended contract total <br />of $4,776.001, with no change in contract time. <br />ram: Approval was requested <br />ders, Inc., for an increase <br />in contract amount of $619.00, (Contract: $2,156.00), to amended <br />contract amount of: $2,775.00, with no change in contract time, <br />for rehabilitation work at: 537 North Euclid Avenue. <br />The Chair asked Mr. Richard E. Pfeifer, Chief Inspector, on this <br />Project, to comment. Mr. Pfeifer advised that the homeowner <br />had a plumbing problem, and everytime the bathtub was used, water <br />was leaking and running to the downstairs bedroom around the light . <br />fixtures and the ceiling was about to collapse. A proceed order <br />was issued immediately as the problem was creating a health and <br />safety hazard for the occupants of the structure. The problem <br />consisted of leaks from the bathtub drain line to the soil stack, <br />leak from the water closet that is cracked at the base, leaks from <br />the waste pipe that connects to the soil stack, and a leaking P -trap <br />and drain line on the lavatory. A major portion of these pipes are <br />concealed either in the floor or wall. <br />The water closet, lavatory, lead waste and drain lines, sub floor <br />were replaced, vinyl tile with waterproof adhesive installed, and <br />eight square feet of drywall replaced under lavatory, and painting, <br />were done in amount of $619.00. <br />mm <br />CHANGE <br />ORDER 2 <br />TO REHAB. <br />CONTRACT <br />53 AP- <br />PROVED, <br />SE CODE <br />ENFORCE- <br />MENT PRO- <br />JECT E -7 <br />CHANGE <br />ORDER 1 <br />TO REHAB. <br />CONTRACT <br />NWCD /PR/ <br />CS -1/05 <br />APPROVED, <br />NWCD <br />PROGRAM <br />