Laserfiche WebLink
REGULAR MEETING DECEMBER 19, 2019 381 <br />awarded and the contract approved as outlined above. Ms. O'Sullivan seconded the motion, which <br />carried. <br />AWARD BID AND APPROVE CONTRACT — MIAMI BASIN VALVE REPLACEMENT — <br />PROJECT NO. 116-082D (LRSA CAPITAL SSDA TIF) <br />Mr. Roger Nawrot, Engineering, advised the Board that on December 10, 2019, bids were received <br />and opened for the above referenced project. After reviewing those bids, Mr. Nawrot <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />HRP Construction Co. Inc., 5777 Cleveland Rd., PO Box 266, South Bend, IN 46624, in the <br />amount of $176,000. Therefore, Ms. Maradik made a motion that the recommendation be accepted <br />and the bid be awarded and the contract approved as outlined above. Ms. O'Sullivan seconded the <br />motion, which carried. <br />AWARD BID AND APPROVE CONTRACT — SMALL DRAINAGE DESIGN AND REPAIR <br />— SAMPSON AND OVERLOOK — PROJECT NO 118-063A (LRSA MAJOR CAPITAL) <br />Ms. Sue Ellen Doudrick, Engineering, advised the Board that on December 10, 2019, bids were <br />received and opened for the above referenced project. After reviewing those bids, Ms. Doudrick <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />HRP Construction Inc., 5777 Cleveland Rd., PO Box 266, South Bend, IN 46624, in the amount <br />of $224,180 for Division A and Alternate No. 1, subject to easement acquisition. Therefore, Ms. <br />Maradik made a motion that the recommendation be accepted and the bid be awarded and the <br />contract approved as outlined above. Ms. O'Sullivan seconded the motion, which carried. <br />AWARD BID AND APPROVE CONTRACT — TWO-WAY CONVERSION OF COLFAX <br />AVE., PHASE II — PROJECT NO 115-053B (RWDA TIF) <br />Mr. Kyle Silveus, Engineering, advised the Board that on November 26, 2019, bids were received <br />and opened for the above referenced project. After reviewing those bids, Mr. Silveus <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN, 46614, in the amount of $594,900. <br />Therefore, Ms. Maradik made a motion that the recommendation be accepted and the bid be <br />awarded and the contract approved as outlined above. Ms. O'Sullivan seconded the motion, which <br />carried. <br />AWARD BID AND APPROVE CONTRACT — PRIVET LANE CULVERT REPLACEMENT — <br />PROJECT NO. 118-013B (LRSA) <br />Ms. Becca Plantz, Engineering, advised the Board that on December 10, 2019, bids were received <br />and opened for the above referenced project. After reviewing those bids, Ms. Plantz recommended <br />that the Board award the contract to the lowest responsive and responsible bidder HRP <br />Construction Inc., 5777 Cleveland Rd., PO Box 266, South Bend, IN 46624, in the amount of <br />$264,471. Therefore, Ms. Maradik made a motion that the recommendation be accepted and the <br />bid be awarded and the contract approved as outlined above. Ms. O'Sullivan seconded the motion, <br />which carried. <br />AWARD QUOTATION — LIGHT -UP SOUTH BEND — LIGHTED DECORATIVE BOLLARD <br />REPLACEMENTS —PROJECT NO 119-005B (COIT) <br />Ms. Alicia Czarnecki, Engineering, advised the Board that on December 10, 2019, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Czarnecki recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, All Phase Electric Supply, 1385 N. Bendix Dr., South Bend, IN 46628, in the <br />amount of $1,936.25 each for a total of $29,043.75. Therefore, Ms. Maradik made a motion that <br />the recommendation be accepted and the quotation be awarded as outlined above. Ms. O'Sullivan <br />seconded the motion, which carried. <br />AWARD QUOTATION — WEST SIDE QUIET ZONE — COMMERCIAL DRIVE <br />RELOCATION— PROJECT NO 120-011 (LRSA) <br />Ms. Becca Plantz, Engineering, advised the Board that on December 10, 2019, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Plantz recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Ritschard Brothers, Inc., 1204 W. Sample St., Mishawaka, IN 46544, in the amount of <br />$49,380 subject to a legal access agreement. Therefore, Ms. Maradik made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Ms. O'Sullivan <br />seconded the motion, which carried. <br />