Laserfiche WebLink
6. NEW BUSINESS (Cont'd <br />nmissioner Robinson asked if this is to be done in coordination <br />th Dr. Wing's staff suggestion and the Chair advised that it is <br />d also that it is a very attractive set of materials. <br />c. Change Order No. 3 to Plaza Park Contract No. 1, Indiana R -66: <br />mmission approval was requested of Change Order No. 3 to Plaza <br />rk Contract No. 1, with Nautilus Construction Corporation, for <br />increase in contract amount of $1,489.80., or a total adjusted <br />ntract price of $201,248.30, per memorandum dated May 5, 1976, <br />om the Bureau of Public Construction, Messrs. Patrick M. McMahon <br />d Bill Slabaugh, in Project Indiana R -66. <br />Mr. Slabaugh advised that originally this contract was let for <br />$ 09,000 more or less, and that on Change Order No. l we removed <br />a little over $10,000 from the contract and we did the work with <br />city forces, at no charge to the contract, for the demolition and <br />removal of streets and curbs and sidewalks. The City was not able <br />t ) remove all the streets, curbs and sidewalks, so this is an ad- <br />j stment amount for work that we turned around and asked Nautilus <br />C nstruction Corporation to do. Instead of removing the entire <br />a ea, he removed small portions of it, and also there is one small <br />item in there for the addition of a retaining wall -type panel, which <br />was put in the foundation near the East Jefferson Street Bridge. <br />Tie old building we had demolished there had the foundation portion <br />c nnected to the bridge, and this part was left in there. We had <br />s me oak plank walers put in, and the walers have since rotted out. <br />It has been six (6) years now and Mr. Slabaugh advised he had in- <br />structed Nautilus Construction Corporation put that in, at a cost <br />o $400.00. It was a permanent installation to hold the backfill <br />ii place. Also, we didn't take everything off with the $10,000 <br />deduction change order, so the other $991.50 was to remove the <br />r st of them. <br />I em 635; To increase topsoil quantity to cover over -run <br />o casioned by preparation of deleted (from Contract) <br />a eas, for the planting of grass seed .................... $1,220.00 <br />I stall 10' x 10' aluminum retaining panel which was <br />ordered to replace Department of Redevelopment wood <br />p nel placed in foundation window opening at the time of <br />d molition of Parcel 15 -2 in 1971. The oak plank walers <br />r tted and endangered the backfill in the park........... 400.00 <br />ding of Module "D" which was deleted from the contract <br />required attention .... ............................... 150.00 <br />Removal of 66.6 square yards of pavement not done by City <br />o South Bend forces as mentioned to delete ($991.50 shown <br />op separate page of change order -- $132.00, 25.00, 60.00, <br />150.00, 89.50, 175.00, 210.00 and 150.00) ............... 233.10 <br />moval of two deadman anchors hidden during engineering <br />eldwork ................ ............................... 33.20 <br />ckhammer work bridge Plaza to complete work not done by <br />CHANGE <br />ORDER NO. <br />3 TO PLAZA <br />PARK CONTRACT <br />NO. 1 AP- <br />PROVED, R -66 <br />