Laserfiche WebLink
6. NEWI BUSINESS (Cont'd <br />a <br />h. <br />Mr. Wiggins moved for the approval of Change Order No. 2 to Re- <br />habilitation Contract No. 51, with Barany Sheet %Metal & Heating <br />Company, for a decrease in contract amount of $46.26, or an <br />amended contract total of $6,996.74, with no change in contract <br />time, in the Southeast Project E -7. Motion seconded by Mr. <br />Donaldson and carried. <br />Change Order`No. 1 to Rehabi`'litation Contract No. 55: Commis- <br />sion approval was requested for this Change Order, with Ted <br />Combs Decorating & "Construction Company, which is for an in- <br />crease in contract amount of $59.00, (Contract: $4,940.96), or <br />an amended total of: $4,999.96, to clean drain line from the <br />basement to the street, at: 625 East Broadway Street, Southeast <br />Project E -7. <br />Mr. James L. Johnson, Jr., Chief Inspector, advised in his memo- <br />randum the specifications called for the second floor bathroom <br />lavatory drain to be cleaned; however, since the time of the <br />initial inspection, tree roots and other debris have clogged the <br />sewer line, and the- staff -is recommending the approval of the <br />change order. <br />Mr. Wiggins moved for the approval of Change Order No. 1 to <br />Rehabilitation Contract No. 55, with Ted Combs Decorating & <br />Construction Company, for an increase in contract amount of <br />$59.00, or an amended contract total of $4,999.96, with no change <br />in contract time, in the Southeast Project E -7 Motion seconded <br />by Mr. Donaldson and carried. <br />Change Order No. l to Rehabilitation Contract No. 58: Commis - <br />sion approval was requested for this Change Order, with Slatile <br />Roofing & Sheet Metal Company, for a decrease in contract <br />amount of $40.00, (Contract: $1,975.00), or an amended total <br />of: $1,935.00, to deduct the replacement of basement window <br />sash, at: 718 East Broadway Street, Southeast Project E -7. <br />. James L. Johnson, Jr., Chief Inspector, outlines in his <br />morandum that this change order is to delete the replacement <br />the northeast basement window sash and the two coat painting <br />ich will decrease the contract in amount of $40.00, or an <br />ended contract amount of $1,935.00. <br />4r. Donaldson moved for the approval of Change Order No..l to <br />Zehabilitation Contract No. 58, with Slatile Roofing & Sheet <br />4etal Company, for a decrease in contract amount of $40.00, <br />)r an amended contract total of $1,935.00, with no change in <br />:ontract time, in the Southeast Project E -7. Motion seconded <br />)y Mr. Wiggins and carried. <br />CHANGE ORDER <br />NO. 1 TO <br />CONTRACT NO. <br />55 APPROVED, <br />SOUTHEAST <br />PROJECT E -7 <br />CHANGE ORDER <br />NO. 1 TO <br />CONTRACT NO. <br />58 APPROVED, <br />SOUTHEAST <br />PROJECT E -7 <br />