6. NEWIBUSINESS (Cont'd <br />ginal rafters were 2 x 4's themselves -- approximately two feet <br />on center - -which are pretty far apart. They should be 2 x 6's <br />or 2 x 8's. <br />Mr. Wiggins moved for the approval of Change Order No. 1 to Re- <br />habilitation Contract No. 47, with Ted Combs Decorating & <br />Construction Company, for an increase in contract amount of <br />$185.00, or an amended contract total of $2,211.40, with no <br />change in contract time, in the Southeast Project E -7. Motion <br />seconded by Mr. Donaldson and carried. <br />e. Change Order No. 2 to Rehabilitation Contract No. 50: Commis- CHANGE ORDER <br />sion approval was requested for this Change Order, with Barany NO. 2 TO <br />Sheet Metal & Heating Company, which is for an increase in con- CONTRACT NO. <br />tract amount of $470.00, (Contract: $6,455.50), or an amended 50 APPROVED, <br />contract total of:. $6,9`25.50, for rehabilitation work at: SOUTHEAST <br />621 East Keasey Street, Southeast Project E -7. PROJECT E -7 <br />Mr. James L. Johnson, Jr., Chief Inspector, in his memorandum <br />reported that an inspection of this structure after the issu- <br />ance of the Notice to Proceed No. 65 revealed the need for <br />the additions, listed on the change order -eight (8) items <br />totalling $1,422.00. The nine (9) items deleted--totalling <br />$952.00- -did not present as serious a hazard to the homeowner <br />as would the additional items if this change order were not <br />approved. The $470.00 difference is an increase to the contract <br />with an amended contract total of $6,925.50. <br />Mr. Brownell advised this appears to be a case where the old <br />inspection wasn't valid and the re- inspection disclosed that <br />the additional items being requested are needed more than the <br />previous items. Mr. Ken Schaller passed photographs that were <br />taken of the hazardous conditions to the Commissioners. <br />Mr. Wiggins moved for the approval of Change Order No. 2 to <br />Rehabilitation Contract No. 50, with Barany Sheet Metal & <br />Heating Company, for an increase in contract amount of $470.00, <br />or an amended contract total of $6,925.50, with no change in <br />contract time, in the Southeast Project E -7. Motion seconded <br />by Mr. Donaldson and carried. <br />f. Change Order No. 2 to Rehabilitation Contract No. 51: Commis- CHANGE ORDER <br />sion approval was requested for this Change Order, with Barany NO. 2 TO <br />Sheet Metal & Heating Company, which is for a decrease in con- CONTRACT NO. <br />tract amount of $46.26, (Contract: $7,043.00), or an amended 51 APPROVED, <br />contract total of: $6,996.74, for specification change, at: SOUTHEAST <br />217 East Dayton Street, Southeast Project E -7. PROJECT E -7 <br />Mr. James L. Johnson, Jr., Chief Inspector, advised in his:memo- <br />randum that the contractor - -as noted in his letter -- stated he <br />did not replace the door jambs as they were in good shape. Instead <br />he had the jambs painted two coats of paint and they look very <br />good, and the $46.26 deduction is in order. <br />- 5 - <br />