My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 03-19-76
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1976
>
RM 03-19-76
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2012 9:10:56 AM
Creation date
9/21/2012 2:53:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.1 <br />7. <br />M <br />.BUSINESS (Cont'd <br />Change Order No. 3 t Rehabilitation Contract No. 27, Southeast <br />Project E -7: Commission approval was requested for this Change <br />Order, with Area Services Inc.," for,specification changes as <br />noted on the change order, with an increase'in contract amount <br />of $338.00, (Contract: $7,629.32), or an amended contract total <br />of: $7,967.32, for rehabilitation work at 708 East Broadway <br />Street, in the Southeast Project E -7. <br />Mr. James L. Johnson, Chief Inspector, Bureau of Housing, ad- <br />vised in his memorandum of March 15th, that the specifications <br />had called for the installation of 1 -1/2" cap on the front and <br />rear steps and the front porch deck. Area Services has suggested <br />that the two sets of steps be replaced because the cap will not <br />be adequate and may again cause the same problem in the future. <br />The front porch deck would be too costly to replace and should <br />be deleted since there is no structural 'danger at present. <br />The staff recommends the Change Order for approval. <br />The addition to the specification: <br />Front & Rear Steps: Tear out and replace <br />front and rear steps and install one 3 foot <br />wrought iron handrail on each. + $838.00 <br />Deletion: <br />Front & Rear Steps: Install 1 -112" <br />cap on front and rear steps and <br />paint two (2) coats. $250.00 <br />Front Porch Deck: Install 1 -1/2" <br />cap on deck, paint deck two (2) <br />coats. 250.00 - 500.00 <br />Increase in contract price .......................... $338.00 <br />Motion was made by Mr. Cira, seconded by Mr. Robinson and carried, <br />for the approval of Change Order No. 3 to Rehabilitation Contract <br />No. 27, with Area Services, Inc., for an increase in contract <br />amount of $338.00, or an amended contract total of $7,967.32, <br />with no change in contract time, in the Southeast Project E -7. <br />20�RESS REPORTS <br />CHANGE <br />ORDER 3 <br />TO REHAB. <br />CONTRACT <br />NO. 27 <br />APPROVED, <br />SOUTHEAST <br />PROJECT E -7 <br />There were no written reports for this meeting. PROGRESS <br />REPORTS <br />8. A-10 Audit -- Neighborhood Development Program, Project Indiana A -10: <br />Mr. Brownell advised our Relocation Staff is working on the A -10 Audit <br />and they are trying to get the HUD personnel to give us an agreed -upon <br />amo nt on various individuals on the relocation audit. <br />- 4 - <br />A -10 <br />AUDIT <br />
The URL can be used to link to this page
Your browser does not support the video tag.