6. NEW BUSINESS (Cont'd <br />insulation is placed in the attic. It fs not blown into the <br />walls as that is rather costly. Most of the heat loss is <br />through the roof, so we would insulate the attic. As to it <br />being cheaper over the long run, Commissioner Wiggins responded <br />that all we can really do is bring the house up to code and the <br />code, at present, does not include insulating the home. <br />Motion was made by Mr. Robinson for the approval of Change <br />Order No. l to Rehabilitation Contract No. 44, with Barany <br />Heating & Sheet Metal, for an increase in contract amount of <br />$1,233.00, or an amended contract total of $7,683.00, with <br />no change °in contract time. Motion was seconded by Mr. Wiggins <br />and carried. <br />f. Change Order No. l to Rehabilitation Contract No. 54, Project <br />E -7: Approval was requested for this Change Order, with <br />Barany Heating & Sheet Metal, for an increase in contract <br />amount of $550.00, (Contract: $5,362.00), or an amended <br />contract total of: $5,912.00, for rehabilitation work at: <br />628 East Indiana Street, in the Southeast Bureau of Housing <br />Project E -7, per explanation in memorandum dated February 4, <br />1976, from Chief Inspector, Mr. James L. Johnson. <br />Mr. Brownell read the memorandum and change order items in its <br />entirety. <br />The specifications had called for the installation of a <br />120,000 BTU gas conversion unit. The contractor suggests <br />that a new furnace would be more adequate for this structure, <br />because of the enormous size of old duct work and the lack of a <br />forced air system. Staff recommends the change order approval. <br />Installation of 160,000 BTU Forced Air Gas <br />Furnance according to South Bend Code....... $ 885.00 <br />Original specifications called for in- <br />stalling 120,000 BTU Gas Conversion unit, <br />deletion..................................... .... 335.00 <br />Total ................ T 550.00 <br />Motion was made by Mr. Wiggins for the approval of Change <br />Order No. l to Rehabilitation Contract No. 54, with Barany <br />Heating & Sheet Metal, for an increase in contract amount <br />of $550.00, or an amended contract total of $5,912.00, with <br />no change in contract time. Motion was seconded by Mr. <br />Robinson and carried. <br />g. Rehabilitation Contracts 1 through 17, Bureau of Housing, <br />HAO Referral Program: The recommendation from Mr. Keith P. <br />Crighton, Director, Bureau of Housing, is that the Redevelop- <br />ment Commission reject the original bid of Slatile Roofing <br />& Sheet Metal, Inc. received totalling $40,166.00, for Re- <br />habilitation Contracts l through 17, for Contract Set l,for <br />the Bureau of Housing, HAO Referral Program, and approve the <br />CHANGE ORDER <br />NO. 1 TO <br />REHABILITATION <br />CONTRACT NO. <br />54 APPROVED, <br />E -7 <br />REHABILITA- <br />TION CONTRACTS <br />1 THRU 17, <br />HAO REFERRAL <br />PROGRAM <br />