Laserfiche WebLink
6. N8W BUSINESS (Cont'd <br />c. Ford Trucks: Authorization was requested to convey title to TWO (2) <br />City of South Bend, Board of Public Works, on two (2) Ford FORD TRUCKS <br />trucks: TITLE CON- <br />VEYED TO <br />1) Model U15, 1974, Title No. 74135174027, CITY OF SOUTH <br />ID No. U15GLU61962. BEND <br />2) Model F37, 1974, Title No. 74135174028, <br />ID No. F37BLU69271. <br />Mr. Brownell advised that these are the two (2) Ford trucks that <br />we purchased in connection with the building of the Pedestrian <br />Way, and the title has never been turned over to the City. The <br />Chair added that at one time we had a fleet of automobiles and <br />approximately a year or so ago, we transferred all but three <br />to the City, and asked if we had ever been paid for those and <br />Mr. Brownell said that we have been. There will not be any <br />payment for the above two Ford trucks, Mr. Brownell added, as <br />these were purchased with bond funds, and we purchased these to <br />turn over to the City for the maintenance of the Mall. <br />Tear out and replace the living and dining <br />room ceilings and paint two coats. These <br />ceilings have been damaged by the leaking <br />of the second floor bathroom water closet .... $ 625.00 <br />Replace second floor bathroom water closet, <br />which has deteriorated since initial inspec- <br />tion......................................... 125.00 <br />Replace nine (9) squares of asphalt shingles. 550.00 <br />Total ........ $1,300.00 <br />Motion was made by Mr. Robinson for the approval of Change <br />Order No. l to Rehabilitation Contract No. 28, with Area <br />Service, Inc., for an increase in contract amount of $1,300.00, <br />or an amended contract total of $7,443.32, with contract time <br />unchanged, seconded by Mr. Wiggins and carried. <br />- 7 - <br />Mr. Wiggins moved for the authorization to convey title to <br />the City of South Bend, Board of Public Works, on the above <br />two Ford trucks, seconded by Mr. Robinson and carried. <br />d. <br />Change Order No. 1 to Rehabilitation Contract No. 28, Project CHANGE ORDER <br />E -7: Approval was requested for this Change Order, with NO. 1 TO <br />Area Service, Inc., for an increase in contract amount of REHABILITATION <br />$1,300.00, (Contract: $6,143.32), or an amended contract CONTRACT NO. <br />total of: $7,443.32, for rehabilitation work at: 708 East 28 APPROVED, <br />Broadway Street, in the Southeast Bureau of Housing Project E -7 <br />E -7, per explanation in memorandum dated February 4, 1976, <br />from Chief Inspector, Mr. James L. Johnson. <br />The change order covers the following items which were not <br />included in the original specifications for the referenced <br />contract: <br />Tear out and replace the living and dining <br />room ceilings and paint two coats. These <br />ceilings have been damaged by the leaking <br />of the second floor bathroom water closet .... $ 625.00 <br />Replace second floor bathroom water closet, <br />which has deteriorated since initial inspec- <br />tion......................................... 125.00 <br />Replace nine (9) squares of asphalt shingles. 550.00 <br />Total ........ $1,300.00 <br />Motion was made by Mr. Robinson for the approval of Change <br />Order No. l to Rehabilitation Contract No. 28, with Area <br />Service, Inc., for an increase in contract amount of $1,300.00, <br />or an amended contract total of $7,443.32, with contract time <br />unchanged, seconded by Mr. Wiggins and carried. <br />- 7 - <br />