Laserfiche WebLink
6. NEW BUSINESS (Cont'd <br />Mr. Keith P. Crighton, Director, Bureau of Housing, was re- <br />quested to explain the recommended work on the change order. <br />Mr. Crighton passed out photographs that showed the damages <br />on the roof, and explained that what has happened, is that <br />since the time of the initial inspection, further water damage <br />has caused portions of the sheathing on the front roof and <br />the rear main section to deteriorate, as is also noted in Mr. <br />James L. Johnson, Jr., Chief Inspector of the Southeast Bureau <br />of Housing's memorandum of December 3, 1975, included in packet. <br />Mr. Crighton advised this change order was requested by our site <br />office staff and was not originated by the contractor. It calls <br />for an addition of 160 square feet of 5/8" plywood sheathing; <br />some 2 x 4's to replace the rotted ones already there; and two <br />rolls of black paper, all in amount of $484.00. We have a <br />rear portion roof to be replaced of 384 square feet of 5/8" <br />plywood sheathing; 70 feet of facia; 70 feet of soffit; two <br />rolls of black paper; and 70 feet of crown moulding, totalling <br />$742.00, or a grand total of: $1,226.00. We are also deleting <br />20 asbestos shingles - -12" x 24 "- -that were on the original <br />specifications that are not needed, in decrease to contract <br />of: $275.00, or a total net increase to the contract of: <br />$951.00. These changes would increase the contract total to: <br />$6,551.00. <br />Mr. Wiggins moved for the approval of Change Order No. 1 to <br />Rehabilitation Contract No. 27, for an increase in contract <br />amount of: $951.00, or an amended contract total of: $6,551.00. <br />Motion was seconded by Mr. Donaldson and carried. <br />b Change Order No. 1 to Rehabilitation Contract No. 49, E -7: <br />Commission approval was requested of Change Order No. 1 to <br />Rehabilitation Contract No. 49, with Ted Combs Decorating <br />Company, for an increase in contract amount of $1,299.50, <br />(Contract: $6,470.53), or an amended contract total of: <br />$7,770.03, for rehabilitation work at: 217 East Calvert <br />Street, Southeast Project E -7. <br />Mr. Keith P. Crighton, Director, Bureau of Housing, advised <br />that this is a similar problem with the roof, which has con- <br />tinued to leak, causing severe damage to the interior of the <br />structure. Also, the structure has no gutters or downspouts <br />at the present time. It has an 8" overhang, and this is <br />causing water to settle along the foundation. What we have <br />are replacement of southeast basement sash, frame, hardware <br />and paint; install 125 feet of gutters; install 70 feet of <br />downspouts. The entire foundation, 200 square feet, has <br />to have stucco, (including the front porch); 3/8" exterior <br />plywood needs to be installed on the front porch, along with <br />three (3) 8 foot wrought iron columns. On the interior, we <br />have the first bedroom that is being panelled and trim <br />painted; the hallway is being repaired, sealed and painted <br />also. The only thing we are deleting is the repairs that <br />were originally called for in the specification and that is <br />- 5 - <br />CHANGE <br />ORDER NO. <br />TO REHAB. <br />CONTRACT <br />NO. 49, <br />APPROVED, <br />E -7 <br />