6. NEW = BUSINESS (Cont' d) <br />iorated; also new floor joists, box beam, and the other items that <br />were not included in the inspection and are items that do need to <br />be repaired. <br />The amount of the original contract.was: $7,312.15- -one of our <br />large contracts. At the time of the inspection and at the time <br />of the bid, the electrical circuitry, the service panel, looked <br />exactly like a 100 amp service. The only way it was discovered <br />was that the electrician when he.pulled the panel found the wiring <br />was not, although it had superficially looked like one. What we <br />are doing is taking out the three existing boxes and installing <br />a circuit breaker panel. There are two jumper boxes on the side. <br />The additional work involved: <br />A. <br />Install new 100 amp service panel with circuit <br />breakers and a new outlet in the kitchen and <br />first floor bedroom .......................... <br />$ 316.00 <br />B. <br />Repair bedroom ceiling and paint ceiling...... <br />200.00 <br />C. <br />Pour new front porch steps and install railing <br />325.00 <br />D. <br />Repair brick chimney between second floor ceil- <br />ing and roof .. ............................... <br />46.00 <br />E. <br />Install 21 squares of roofing instead of the <br />11 squares specified ......................... <br />290.00 <br />F. <br />Install new floor joist, box beam, 1/2" ply- <br />wood sheathing on the upper rear porch. Also <br />install new rafter where needed and repair <br />ceiling....... ............................... <br />460.00 <br />Total C.O. .................. $1,637.00 <br />Originally the contract was to take out the pillars on the side of <br />the steps, and, in doing so, it was discovered that was a poured <br />section of the steps. They were not completely set - -were partly <br />sand filled - -and the way that has been pulled away it was neces- <br />sary that it be completely replaced, complete with wrought iron <br />hand rails. <br />There was an exposed portion of the existing chimney requiring <br />four courses of bricks. <br />Item F was the most extensive item, and the contractor discovered <br />that all the boards were severely deteriorated due to water leakage <br />from the roof running down to the posts and box beams. <br />Mr. Crighton advised this dollar amount is still below the other bids <br />we received for this property back on January 20, 1975, and those <br />bids were: $9,978 and $12,493. This would be on the original speci- <br />fications and we are still far below that amount. <br />- 16 - <br />