A <br />NEW BUSINESS (Cont'd) <br />Motion for the approval of the above change order was made <br />by Mr. Wiggins, seconded by Mr. Cira and carried, for an <br />increase in contract amount of $260.00. <br />e. Change Order No. 1 to Rehabilitation Contract No. 40, E -7: <br />Commission approval was requested for this Change Order, <br />which is requested by the homeowner, for changes in rehabi- <br />litation work, at 624 East Keasey Street, with no change in <br />contract price. The Contract was awarded to ABC Plumbing & <br />Heating, Inc., in contract amount of $4,977.79, Project E -7. <br />The memorandum from Mr. Kenneth J. Schaller, Project Director, <br />Southeast Bureau of Housing, requests approval of the Change <br />Order. The owner submitted his request, in writing, dated <br />August 20, 1975. Subsequent to the owner's request, the <br />staff contacted the contractor (ABC Plumbing & Heating, Inc.) <br />to submit a cost estimate of what could be done to accommodate <br />the owner. The owner is requesting: In'the bathroom, they <br />would rather have the walls and ceiling repaired than have <br />new flooring. In the kitchen, they are requesting a sink <br />and cabinets instead of the kitchen flooring. The reason <br />is the same as for the bathroom, they can't have both, so <br />they prefer to have a good sink "that works properly. Perhaps <br />we can fix the flooring later." <br />CHANGE <br />ORDER NO. 1 <br />TO REHAB <br />CONTRACT <br />NO. 40 <br />APPROVED, <br />E -7 <br />The contractor states the walls and ceiling in the bathroom are <br />in very bad shape due to the roof leaking for some period of <br />time. The owner also requested a new metal sink cabinet with <br />new faucets and trap. <br />Additions: Kitchen sink, cabinet - install sink base <br />cabinet and replace faucets and trap $ 270.00 <br />Bathroom walls and ceiling - drywall and <br />tape walls and ceiling 243.60 <br />Total $ 513.60 <br />Deletions: Kitchen floor - install 1/4" under - <br />layment and cover with tile $ 210.00 <br />Bathroom lavatory - install new lavatory 180.00 <br />Dining room screens - install two <br />aluminum combinations 81.60 <br />Second floor living room screen - <br />install one aluminum combination 42.00 <br />Total $ 513.60 <br />Mr. Keith Crighton, Director, Bureau of Housing, advised the <br />above changes are at the home owners request. One of the <br />specific items is the kitchen sink, and under the guidelines <br />