Laserfiche WebLink
A <br />NEW BUSINESS (Cont'd) <br />c. Change Order No. 1 to Rehabilitation Contract No. 219 E -7: <br />.Commission approval was requested for this Change Order, <br />with Barany Heating, for rehabilitation work at 1318 Fellows <br />Street, in amount of $50.00, for an amended contract total <br />of: $5,450.00, Project E -7. <br />The memorandum from Mr. James Johnson, Chief Inspector, <br />Southeast Bureau of Housing, requests approval of this <br />Change Order, for following reasons: "The technical speci- <br />fications call for the installation of new faucets on the <br />lavatory. To complete the job properly, the staff agrees <br />with the contractor and the homeowner that the crown vent and <br />S -trap should also be installed. The additional cost would <br />be $50.00. The lavatory is located in the second floor bath- <br />room over the kitchen, and, at present, water is leaking down <br />through the floor and ceiling of the kitchen. This presents <br />a serious health problem and should be corrected." <br />Mr. Keith P. Crighton, Director, Bureau of Housing, said <br />in connection with the plumbing, he was told they need a <br />crown vent and an S -trap. Commissioner Chenney responded <br />that an "S" trap is not allowed to be used in the City of <br />South Bend; they would have to use a "P" trap, or whatever <br />is needed. Mr. Crighton advised the plumber will be respon- <br />sible for whatever is necessary to come up to South Bend <br />code. <br />Barany Heating's change order requests: "Second Floor <br />Bathroom Lavatory - Replace crown vent and S -trap and tie <br />into existing plumbing.lines. $50.00." <br />Motion for the approval of the above change order was made <br />by Mr. Wiggins, seconded by Mr. Cira and carried, for an <br />increase in contract amount of $50.00. <br />d. Change Order No. l to Rehabilitation Contract No. 39; 1 E -7: <br />Commission approval was requested for this Change Order, <br />with Barany Heating, for rehabilitation work at 718 East <br />Ohio Street, in amount of $260.00, for an amended contract <br />total of: $5,455.00, Project E -7. <br />The memorandum from Mr. James Johnson, Chief Inspector, <br />Southeast Bureau of Housing, requests approval of this <br />Change Order. "The technical specifications call for the <br />replacement of bathtub fixtures. To complete the job <br />properly, the staff agrees with the contractor and the <br />homeowner that the bathtub should also be replaced. The <br />additional cost would be $260.00. The bathtub is located <br />in the first floor bathroom next to the kitchen. Since <br />the time of the initial inspection, the bathtub has <br />corroded and the water lines are leaking. This presents a <br />serious health problem and should be corrected.'" <br />- 7 - <br />CHANGE <br />ORDER NO. <br />TO REHAB <br />CONTRACT <br />NO. 21 <br />APPROVED, <br />E -7 <br />CHANGE <br />ORDER NO. <br />TO REHAB <br />CONTRACT <br />NO. 39 <br />APPROVED, <br />E -7 <br />