BID/PROPOSAL Addendum No. 2
<br />CITY OF SOUTH BEND
<br />12,
<br />Tree, Remove, over 8" to 12"
<br />1
<br />EACH
<br />600.00
<br />$600.00
<br />13.
<br />Tree, Remove, over 12" to 24"
<br />3
<br />EACH
<br />1,200.00
<br />$3,600.00
<br />14,
<br />Common Excavation
<br />810
<br />CYD
<br />72.00
<br />$58,320.00
<br />15.
<br />"B" Borrow
<br />690
<br />CYD
<br />32.00
<br />$22,080.00
<br />16.
<br />Temporary Erosion Control, Silt Fence
<br />1,550
<br />LFT
<br />2.75
<br />$4,262.50
<br />17.
<br />Temporary Erosion Control, Inlet Protection
<br />6
<br />EACH
<br />85.00
<br />$510.00
<br />18.
<br />Temporary Erosion Control
<br />1
<br />LS
<br />1,900.00
<br />$1,900.00
<br />19.
<br />Compacted Aggregate for Base, No. 73
<br />16
<br />TON
<br />64.00
<br />$1,024.00
<br />20,
<br />Engineered Base
<br />25
<br />TON
<br />72.55
<br />$1,813.75
<br />21,
<br />Sidewalk, Concrete, 5"
<br />3,000
<br />SYD
<br />72.00
<br />$216,000.00
<br />22.
<br />Curb Ramp, Concrete
<br />10
<br />SYD
<br />130.00
<br />$1,300.00
<br />23,
<br />Concrete Curb, 6"
<br />85
<br />LFT
<br />78.00
<br />$6,630.00
<br />24.
<br />Concrete Curb, Depressed
<br />65
<br />LFT
<br />136.00
<br />$8,840.00
<br />25.
<br />Grass Pavers
<br />75
<br />SYD
<br />64.47
<br />$4,835.25
<br />26.
<br />Tree, Commemoration Sugar Maple, 2.5"
<br />1
<br />EACH
<br />620.00
<br />$620.00
<br />27,
<br />Tree, American Hombeam, 2.5"
<br />2
<br />EACH
<br />682.50
<br />$1,365.00
<br />28.
<br />Tree, Kentucky Coffee Tree, 2.5"
<br />1
<br />EACH
<br />607.50
<br />$607.50
<br />29.
<br />Tree, Tulip Tree, 2.5"
<br />4
<br />EACH
<br />657.50
<br />$2,630.00
<br />30.
<br />Tree, Cucumbertree Magnolia, 2.5"
<br />7
<br />EACH
<br />732.50
<br />$5,127.50
<br />31,
<br />Tree, Black Tupelo, 2.5"
<br />2
<br />EACH
<br />707.50
<br />$1,415.00
<br />32.
<br />Tree, Swamp White Oak, 2.5"
<br />1
<br />EACH
<br />707.50
<br />$707.50
<br />33.
<br />Tree, Chinkapin Oak, 2.5"
<br />2
<br />EACH
<br />707.50
<br />$1,415.00
<br />34,
<br />Tree, Pin Oak, 2.5"
<br />3
<br />EACH
<br />632.50
<br />$1,897.50
<br />35,
<br />Topsoil
<br />180
<br />CYD
<br />56.25
<br />$10,125.00
<br />36.
<br />Mulched Seeding
<br />1,800
<br />SYD
<br />9.00
<br />$16,200.00
<br />37.
<br />Erosion Control Blankets
<br />1,060
<br />SYD
<br />3.44
<br />$3,646.40
<br />38.
<br />Casting, Adjust to Grade
<br />5
<br />EACH
<br />615.00
<br />$3,075.00
<br />39.
<br />Sheet Piling, Steel, PZ27
<br />9,690
<br />SIFT
<br />45.00
<br />$436,050.00
<br />40.
<br />Pile Cap
<br />430
<br />LFT
<br />215.00
<br />$92,450.00
<br />41.
<br />Retaining Wall, Cast -In -Place, 22" Width
<br />120
<br />LFT
<br />830.00
<br />$99,600.00
<br />42.
<br />Pedestrian Railing
<br />550
<br />LFT
<br />365.00
<br />$200,750.00
<br />43.
<br />Fence
<br />6
<br />LFT
<br />480.00
<br />$2,880.00
<br />44.
<br />Sheet Sign
<br />13
<br />SIFT
<br />21.00
<br />$273.00
<br />45.
<br />Sign Post, Type 2, Reinforced Anchor Base
<br />110
<br />LFT
<br />16.00
<br />$1,760.00
<br />46.
<br />Sheet Sign, Remove and Relocate
<br />6
<br />EACH
<br />120.00
<br />$960.00
<br />
|