My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - River Walk from Beyer Street to Howard Park Proj No 117-083A - Walsh & Kelly, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - River Walk from Beyer Street to Howard Park Proj No 117-083A - Walsh & Kelly, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:49:30 AM
Creation date
12/12/2019 10:31:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT NAME: <br />PROJECT NO. <br />FOR BIDS DUE: <br />CONTRACTOR NAME: <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Addendum No. 2 <br />Riverwalk from Beyer Street to Howard Park <br />177-083A <br />December 10, 2019 <br />Walsh & Kelly, Inc.TO <br />� � <br />a <br />Division <br />1: River Wall Repair <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />7,850.00 <br />$7,850.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />73,000.00 <br />$73,000.00 <br />3. <br />Concrete Sidewalks and Approaches, Remove <br />140 <br />SYD <br />60.00 <br />$8,400.00 <br />4. <br />Cofferdams and Dewatering <br />1 <br />LS <br />279,000.00 <br />$279,000.00 <br />5. <br />Sidewalk, Concrete, 4" <br />150 <br />SYD <br />152.00 <br />$22,800.00 <br />6. <br />River Wall, Repair, Type A <br />217 <br />LFT <br />400.00 <br />$86,800.00 <br />7, <br />River Wall, Repair, Type B <br />226 <br />LFT <br />475.00 <br />$107,350.00 <br />8. <br />River Wall, Remove and Replace <br />129 <br />LFT <br />1,200.00 <br />$154,800.00 <br />Division 1: River Wall Repair $740,000.00 <br />Addendum No. 2 <br />Division 2: Upper Walk <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />8,600.00 <br />$8,600.00 <br />2. <br />1 Mobilization/Demobilization <br />1 <br />LS <br />72,425.00 <br />$72,425.00 <br />3. <br />CPM Schedule <br />1 <br />LS <br />4,014.10 <br />$4,014.10 <br />4. <br />CPM Monthly Update <br />11 <br />MO <br />75.00 <br />$825.00 <br />5. <br />Maintaining Traffic <br />1 <br />LS <br />45,000.00 <br />$45,000.00 <br />6. <br />Clearing Right of Way <br />1 <br />LS <br />27,600.00 <br />$27,600.00 <br />7. <br />Concrete Sidewalks and Approaches, Remove <br />720 <br />SYD <br />15.00 <br />$10,800.00 <br />8. <br />Concrete Curb, Remove <br />77 <br />LFT <br />22.00 <br />$1,694.00 <br />9, <br />Light Pole and Foundation, Remove <br />16 <br />EACH <br />345.00 <br />$5,520.00 <br />% <br />Sign, Remove <br />1 <br />EACH <br />210.00 <br />$210.00 <br />11, <br />Tree, Remove, 4" to 8" <br />1 <br />EACH <br />250.00 <br />$250.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.