BID/PROPOSAL Addendum No. 2
<br />CITY OF SOUTH BEND
<br />47,
<br />4-1/c No. 8 Copper Cable
<br />2,970
<br />LFT
<br />3.20
<br />$9,504.00
<br />48.
<br />1 1/2" PVC Schedule 80 for Lighting
<br />2,080
<br />LFT
<br />8.76
<br />$18,220.80
<br />49.
<br />1 1/2" PVC Schedule 80 for Lighting, in Pile Cap
<br />510
<br />LFT
<br />12.00
<br />$6,120.00
<br />50.
<br />1 112" PVC Schedule 80 for Lighting, Directionally Bored
<br />380
<br />LFT
<br />10.54
<br />$4,005.20
<br />51,
<br />Light Pole Foundation
<br />29
<br />EACH
<br />790.00
<br />$22,910.00
<br />52.
<br />Light Pole and Luminaire, LED, Pedestrian Light, Furnish
<br />2
<br />EACH
<br />6,400.00
<br />$12,800.00
<br />53.
<br />Light Pole and Luminaire, LED, Pedestrian Light, Furnish
<br />35
<br />EACH
<br />6,540.00
<br />$228,900.00
<br />and Install
<br />54.
<br />TESCO Combination Cabinet and Foundation
<br />1
<br />EACH
<br />7,140.00
<br />$7,140.00
<br />55.
<br />Miscellaneous Equipment for Lighting
<br />1
<br />LS
<br />6,457.00
<br />$6,457.00
<br />56.
<br />.�..�.._.........._
<br />Transverse Pavement Marking, Paint, Stop Line, 24"
<br />11
<br />LFT
<br />�
<br />5.00
<br />..._
<br />$55.00
<br />57.
<br />Pavement Marking, Solid, Green
<br />360
<br />SFT
<br />10.00
<br />$3,600.00
<br />58.
<br />Hardwood Mulch
<br />60
<br />CYS
<br />68.00
<br />$4,080.00
<br />Division 2: Upper Walk $1,716,000.00
<br />Addendum No. 2
<br />Division 3: Lower Walk
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />FU7nitUnit
<br />Price
<br />Total Amount
<br />1,
<br />Construction Engineering
<br />1
<br />LS
<br />7,831.00
<br />$7,831.00
<br />2.
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />58,000.00
<br />$58,000.00
<br />3.
<br />Concrete Sidewalks and Approaches, Remove
<br />810
<br />SYD
<br />46.00
<br />$37,260.00
<br />4.
<br />Light Pole and Foundation, Remove
<br />28
<br />EACH
<br />345.00
<br />$9,660.00
<br />5.
<br />Tree, Remove, over 24" to 36"
<br />1
<br />EACH
<br />1,800.00
<br />$1,800.00
<br />6.
<br />Tree, Remove, over 36" to 60"
<br />2
<br />EACH
<br />2,400.00
<br />$4,800.00
<br />7.
<br />Common Excavation
<br />50
<br />CYD
<br />790.00
<br />$39,500.00
<br />8,
<br />"B" Borrow
<br />50
<br />CYD
<br />131.00
<br />$6,550.00
<br />9.
<br />Temporary Erosion Control, Silt Fence
<br />910
<br />LFT
<br />2.75
<br />$2,502.50
<br />10,
<br />Temporary Erosion Control
<br />1
<br />LS
<br />1,900.00
<br />$1,900.00
<br />11.
<br />Sidewalk, Concrete, 4"
<br />120
<br />SYD
<br />160.00
<br />$19,200.00
<br />12
<br />Sidewalk, Stamped Concrete with Integral Color, 5"
<br />60
<br />SYD
<br />470.00
<br />$28,200 00
<br />13.
<br />Landscape Edging, Aluminum, Black
<br />80
<br />LFT
<br />7.25
<br />$580.00
<br />14,
<br />Tree, Red Maple, 2.5"
<br />3
<br />EACH
<br />620.00
<br />$1,860.00
<br />15.
<br />Tree, Commemoration Sugar Maple, 2.5"
<br />2
<br />EACH
<br />620.00
<br />$1,240.00
<br />16.
<br />Tree, American Hornbeam, 2.5"
<br />2
<br />EACH
<br />682.50
<br />$1,365.00
<br />
|