Laserfiche WebLink
BID/PROPOSAL Addendum No. 2 <br />CITY OF SOUTH BEND <br />47, <br />4-1/c No. 8 Copper Cable <br />2,970 <br />LFT <br />3.20 <br />$9,504.00 <br />48. <br />1 1/2" PVC Schedule 80 for Lighting <br />2,080 <br />LFT <br />8.76 <br />$18,220.80 <br />49. <br />1 1/2" PVC Schedule 80 for Lighting, in Pile Cap <br />510 <br />LFT <br />12.00 <br />$6,120.00 <br />50. <br />1 112" PVC Schedule 80 for Lighting, Directionally Bored <br />380 <br />LFT <br />10.54 <br />$4,005.20 <br />51, <br />Light Pole Foundation <br />29 <br />EACH <br />790.00 <br />$22,910.00 <br />52. <br />Light Pole and Luminaire, LED, Pedestrian Light, Furnish <br />2 <br />EACH <br />6,400.00 <br />$12,800.00 <br />53. <br />Light Pole and Luminaire, LED, Pedestrian Light, Furnish <br />35 <br />EACH <br />6,540.00 <br />$228,900.00 <br />and Install <br />54. <br />TESCO Combination Cabinet and Foundation <br />1 <br />EACH <br />7,140.00 <br />$7,140.00 <br />55. <br />Miscellaneous Equipment for Lighting <br />1 <br />LS <br />6,457.00 <br />$6,457.00 <br />56. <br />.�..�.._.........._ <br />Transverse Pavement Marking, Paint, Stop Line, 24" <br />11 <br />LFT <br />� <br />5.00 <br />..._ <br />$55.00 <br />57. <br />Pavement Marking, Solid, Green <br />360 <br />SFT <br />10.00 <br />$3,600.00 <br />58. <br />Hardwood Mulch <br />60 <br />CYS <br />68.00 <br />$4,080.00 <br />Division 2: Upper Walk $1,716,000.00 <br />Addendum No. 2 <br />Division 3: Lower Walk <br />Item <br />No. <br />Description <br />Quantity <br />FU7nitUnit <br />Price <br />Total Amount <br />1, <br />Construction Engineering <br />1 <br />LS <br />7,831.00 <br />$7,831.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />58,000.00 <br />$58,000.00 <br />3. <br />Concrete Sidewalks and Approaches, Remove <br />810 <br />SYD <br />46.00 <br />$37,260.00 <br />4. <br />Light Pole and Foundation, Remove <br />28 <br />EACH <br />345.00 <br />$9,660.00 <br />5. <br />Tree, Remove, over 24" to 36" <br />1 <br />EACH <br />1,800.00 <br />$1,800.00 <br />6. <br />Tree, Remove, over 36" to 60" <br />2 <br />EACH <br />2,400.00 <br />$4,800.00 <br />7. <br />Common Excavation <br />50 <br />CYD <br />790.00 <br />$39,500.00 <br />8, <br />"B" Borrow <br />50 <br />CYD <br />131.00 <br />$6,550.00 <br />9. <br />Temporary Erosion Control, Silt Fence <br />910 <br />LFT <br />2.75 <br />$2,502.50 <br />10, <br />Temporary Erosion Control <br />1 <br />LS <br />1,900.00 <br />$1,900.00 <br />11. <br />Sidewalk, Concrete, 4" <br />120 <br />SYD <br />160.00 <br />$19,200.00 <br />12 <br />Sidewalk, Stamped Concrete with Integral Color, 5" <br />60 <br />SYD <br />470.00 <br />$28,200 00 <br />13. <br />Landscape Edging, Aluminum, Black <br />80 <br />LFT <br />7.25 <br />$580.00 <br />14, <br />Tree, Red Maple, 2.5" <br />3 <br />EACH <br />620.00 <br />$1,860.00 <br />15. <br />Tree, Commemoration Sugar Maple, 2.5" <br />2 <br />EACH <br />620.00 <br />$1,240.00 <br />16. <br />Tree, American Hornbeam, 2.5" <br />2 <br />EACH <br />682.50 <br />$1,365.00 <br />