BID/PROPOSAL Addendum II
<br />CITY OF SOUTH BEND
<br />12.
<br />Tree, Remove, over 8" to 12"
<br />1
<br />EACH
<br />20 , 00
<br />820.00
<br />13.
<br />Tree, Remove, over 12" to 24"
<br />3
<br />EACH
<br />1 , 630.00
<br />4,890.00
<br />14.
<br />15.
<br />Common Excavation
<br />"B" Borrow
<br />810
<br />690
<br />CYD
<br />CYD
<br />90.00
<br />75.00
<br />72, 900.00
<br />51 750.00
<br />16.
<br />Temporary Erosion Control, Silt Fence
<br />1,550
<br />LFT
<br />1.88
<br />2,914.00
<br />17.
<br />Temporary Erosion Control, Inlet Protection
<br />6
<br />EACH
<br />18.
<br />Temporary Erosion Control
<br />1
<br />LS
<br />11,590.00
<br />11,590.00
<br />19.
<br />Compacted Aggregate for Base, No. 73
<br />16
<br />TON
<br />120.00
<br />1,920.00
<br />20.
<br />Engineered Base
<br />25
<br />TON
<br />21.
<br />Sidewalk, Concrete, 5"
<br />3,000
<br />SYD
<br />65.00
<br />195, 000.00
<br />22.
<br />iCurb Ramp, Concrete
<br />10
<br />SYD
<br />275.00
<br />2,750.00
<br />23,
<br />24.
<br />25.
<br />26.
<br />Concrete Curb, 6"
<br />Concrete Curb, Depressed
<br />Grass Pavers
<br />Tree, Commemoration Sugar Maple, 2.5"
<br />85
<br />65
<br />75
<br />1
<br />LFT
<br />LFT
<br />SYD
<br />EACH
<br />76.00
<br />76.00
<br />110.00
<br />500.00
<br />6,460.00
<br />4,940.00
<br />8,250.00
<br />500.00
<br />27.
<br />Tree, American Hornbeam, 2.5"
<br />2
<br />EACH
<br />500.00
<br />1,000.00
<br />28.
<br />Tree, Kentucky Coffee Tree, 2.5"
<br />1
<br />EACH
<br />515.00
<br />515.00
<br />29.
<br />Tree, Tulip Tree, 2.5"
<br />4
<br />EACH
<br />485.00
<br />1,940.00
<br />30„
<br />Tree, Cucumbertree Magnolia, 2.5"
<br />7
<br />EACH
<br />500.00
<br />3,500.00
<br />31.
<br />Tree, Black Tupelo, 2.5"
<br />2
<br />EACH
<br />550.00
<br />1,100.00
<br />32. 1
<br />Tree, Swamp White Oak, 2.5"
<br />1
<br />EACH
<br />500.00
<br />500.00
<br />33.
<br />34.
<br />Tree, Chinkapin Oak, 2.5"
<br />Tree, Pin Oak, 2.5"
<br />2
<br />3
<br />EACH
<br />EACH
<br />500.00
<br />500.00
<br />1,000.00
<br />1,500.00
<br />35.
<br />Topsoil
<br />180
<br />CYD
<br />150.00
<br />27, 000.00
<br />36.
<br />Mulched Seeding
<br />1,800
<br />SYD
<br />1.15
<br />2,070.00
<br />37.
<br />Erosion Control Blankets
<br />1,060
<br />SYD
<br />2.60
<br />2,756.00
<br />38.
<br />39.
<br />Casting, Adjust to Grade
<br />Sheet Piling, Steel, PZ27
<br />5
<br />9,690
<br />EACH
<br />SFT
<br />43.00
<br />416 670.00
<br />40.
<br />Pile Cap
<br />430
<br />LFT
<br />410.00
<br />176, 300.00
<br />41,
<br />42.
<br />Retaining Wall, Cast -In -Place, 22" Width
<br />Pedestrian Railing
<br />120
<br />550
<br />LFT
<br />LFT
<br />625.00
<br />440.00
<br />75,000.00
<br />242, 000.00
<br />43.
<br />Fence
<br />6
<br />LFT
<br />203.80
<br />44.
<br />Sheet Sign
<br />13
<br />SFT
<br />18.50
<br />240.50
<br />45.
<br />Sign Post, Type 2, Reinforced Anchor Base
<br />110
<br />LFT
<br />12.50
<br />1,375.00
<br />46.
<br />Sheet Sign, Remove and Relocate
<br />8
<br />EACH
<br />Version 1/17/2019 Contractor's Bid for Public Works - 8
<br />
|