Laserfiche WebLink
BID/PROPOSAL Addendum II <br />CITY OF SOUTH BEND <br />12. <br />Tree, Remove, over 8" to 12" <br />1 <br />EACH <br />20 , 00 <br />820.00 <br />13. <br />Tree, Remove, over 12" to 24" <br />3 <br />EACH <br />1 , 630.00 <br />4,890.00 <br />14. <br />15. <br />Common Excavation <br />"B" Borrow <br />810 <br />690 <br />CYD <br />CYD <br />90.00 <br />75.00 <br />72, 900.00 <br />51 750.00 <br />16. <br />Temporary Erosion Control, Silt Fence <br />1,550 <br />LFT <br />1.88 <br />2,914.00 <br />17. <br />Temporary Erosion Control, Inlet Protection <br />6 <br />EACH <br />18. <br />Temporary Erosion Control <br />1 <br />LS <br />11,590.00 <br />11,590.00 <br />19. <br />Compacted Aggregate for Base, No. 73 <br />16 <br />TON <br />120.00 <br />1,920.00 <br />20. <br />Engineered Base <br />25 <br />TON <br />21. <br />Sidewalk, Concrete, 5" <br />3,000 <br />SYD <br />65.00 <br />195, 000.00 <br />22. <br />iCurb Ramp, Concrete <br />10 <br />SYD <br />275.00 <br />2,750.00 <br />23, <br />24. <br />25. <br />26. <br />Concrete Curb, 6" <br />Concrete Curb, Depressed <br />Grass Pavers <br />Tree, Commemoration Sugar Maple, 2.5" <br />85 <br />65 <br />75 <br />1 <br />LFT <br />LFT <br />SYD <br />EACH <br />76.00 <br />76.00 <br />110.00 <br />500.00 <br />6,460.00 <br />4,940.00 <br />8,250.00 <br />500.00 <br />27. <br />Tree, American Hornbeam, 2.5" <br />2 <br />EACH <br />500.00 <br />1,000.00 <br />28. <br />Tree, Kentucky Coffee Tree, 2.5" <br />1 <br />EACH <br />515.00 <br />515.00 <br />29. <br />Tree, Tulip Tree, 2.5" <br />4 <br />EACH <br />485.00 <br />1,940.00 <br />30„ <br />Tree, Cucumbertree Magnolia, 2.5" <br />7 <br />EACH <br />500.00 <br />3,500.00 <br />31. <br />Tree, Black Tupelo, 2.5" <br />2 <br />EACH <br />550.00 <br />1,100.00 <br />32. 1 <br />Tree, Swamp White Oak, 2.5" <br />1 <br />EACH <br />500.00 <br />500.00 <br />33. <br />34. <br />Tree, Chinkapin Oak, 2.5" <br />Tree, Pin Oak, 2.5" <br />2 <br />3 <br />EACH <br />EACH <br />500.00 <br />500.00 <br />1,000.00 <br />1,500.00 <br />35. <br />Topsoil <br />180 <br />CYD <br />150.00 <br />27, 000.00 <br />36. <br />Mulched Seeding <br />1,800 <br />SYD <br />1.15 <br />2,070.00 <br />37. <br />Erosion Control Blankets <br />1,060 <br />SYD <br />2.60 <br />2,756.00 <br />38. <br />39. <br />Casting, Adjust to Grade <br />Sheet Piling, Steel, PZ27 <br />5 <br />9,690 <br />EACH <br />SFT <br />43.00 <br />416 670.00 <br />40. <br />Pile Cap <br />430 <br />LFT <br />410.00 <br />176, 300.00 <br />41, <br />42. <br />Retaining Wall, Cast -In -Place, 22" Width <br />Pedestrian Railing <br />120 <br />550 <br />LFT <br />LFT <br />625.00 <br />440.00 <br />75,000.00 <br />242, 000.00 <br />43. <br />Fence <br />6 <br />LFT <br />203.80 <br />44. <br />Sheet Sign <br />13 <br />SFT <br />18.50 <br />240.50 <br />45. <br />Sign Post, Type 2, Reinforced Anchor Base <br />110 <br />LFT <br />12.50 <br />1,375.00 <br />46. <br />Sheet Sign, Remove and Relocate <br />8 <br />EACH <br />Version 1/17/2019 Contractor's Bid for Public Works - 8 <br />