Laserfiche WebLink
BID/PROPOSAL Addendum No. 2 <br />CITY OF SOUTH BEND <br />Project Name: Riveruvaik from Beyer Street to Howard Park <br />Project Number: 117-08A ,w <br />For Bids Due: December 10, 2019 <br />Contractor Name: Northern Indiana Construction Company Inc. <br />Division 1: River Wall Repair <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />35 000.00 <br />35 000.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />64, 000.00 <br />64, 000.00 <br />1 <br />Concrete Sidewalks and Approaches, Remove <br />140 <br />SYD <br />40.50 <br />5 670.00 <br />4. <br />Cofferdams and Dewatering <br />1 <br />LS <br />555 000.00 <br />555 000.00 <br />5. <br />Sidewalk, Concrete, 4" <br />150 <br />SYD <br />70.00 <br />10, 500.00 <br />6. <br />River Wall, Repair, Type A <br />217 <br />LFT <br />175.00 <br />37 975.00 <br />T <br />River Wall, Repair, Type B <br />226 <br />LFT <br />625.00 <br />141, 250. 00 <br />8. <br />River Wall, Remove and Replace <br />129 <br />LFT <br />2.000.00 <br />258, 000.00 <br />Division 1: River Wall Repair 1 ,107, 395.00 <br />Division 2: Upper Walk <br />Item <br />No. <br />Description <br />ntit <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />35 000. 00 <br />35, 000.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />64, 000.00 <br />64, 000.00 <br />3. <br />CPM Schedule <br />1 <br />LS <br />7,700.00 <br />7,700.00 <br />4. <br />CPM Monthly Update <br />11 <br />MO <br />750.00 <br />8,250.00 <br />5. <br />Maintaining Traffic <br />1 <br />LS <br />0 <br />10 250.00 <br />6, <br />Clearing Right of Way <br />1 <br />LS <br />54, 766.04 <br />54, 766.04 <br />7. <br />Concrete Sidewalks and Approaches, Remove <br />720 <br />SYD <br />40.50 <br />29,160.00 <br />8. <br />Concrete Curb, Remove <br />77 <br />LFT <br />30.00 <br />2,310.00 <br />9. <br />Light Pole and Foundation, Remove <br />16 <br />EACH <br />500.00 <br />8,000.00 <br />10. <br />Sign, Remove <br />1 <br />EACH <br />11, <br />Tree, Remove, 4" to 8" <br />1 <br />EACH <br />366. 00 <br />366.00 <br />Version 1/17/2019 Contractor's Bid for Public Works - 7 <br />