Laserfiche WebLink
BID/PROPOSAL Addendum No. 2 <br />CITY OF SOUTH BEND <br />M48.47. <br />4-1/c No. 8 Copper Cable <br />2,970 <br />LFT <br />4.20 <br />12.474.00 <br />1 112" PVC Schedule 80 for Lighting <br />2,080 <br />LFT <br />4.40 <br />9,152.00 <br />49. <br />50. <br />1 1/2" PVC Schedule 80 for Lighting, in Pile Cap <br />1 1/2" PVC Schedule 80 for Lighting, Directionally Bored <br />510 <br />380 <br />LFT <br />LFT <br />5.40 <br />10.00 <br />2,754.00 <br />3,800.00 <br />51, <br />Light Pole Foundation <br />29 <br />EACH <br />620.00 <br />17, 980.00 <br />52. <br />Light Pole and Luminaire, LED, Pedestrian Light, Furnish <br />2 <br />EACH <br />7,200.00 <br />14, 400.00 <br />53. <br />Light Pole and Luminaire, LED, Pedestrian Light, Furnish <br />and Install <br />35 <br />EACH <br />7,200.00 <br />252, 000.00 <br />54. <br />TESCO Combination Cabinet and Foundation <br />1 <br />EACH <br />7,500.00 <br />7,500.00 <br />55. <br />Miscellaneous Equipment for Lighting <br />1 <br />LS <br />3,500.00 <br />3,500.00 <br />56. ITransverse <br />57. <br />Pavement Marking, Paint, Stop Line, 24" <br />Pavement Marking, Solid, Green <br />11 <br />360 <br />LFT <br />SFT <br />35.00 <br />8.60 <br />385.00 <br />3,096.00 <br />58. <br />Hardwood Mulch <br />60 <br />CYD <br />5,580.00 <br />Division 2: Upper Walk <br />1,880,302.34 <br />Division 3: Lower Walk <br />Item <br />No. <br />Descrit!on <br />Quantity <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />14 875.00 <br />14 875.00 <br />Mobilization/Demobilization <br />1 <br />64,000.00 <br />64,000.00 <br />3. <br />Concrete Sidewalks and Approaches, Remove <br />810 <br />40-50 <br />32,805.00 <br />4. <br />5. <br />Light Pole and Foundation, Remove <br />Tree, Remove, over 24" to 36" <br />28 <br />1 <br />500.00 <br />2,730.00 <br />14,000.00 <br />2,730.00 <br />6. <br />Tree, Remove, over 36" to 60" <br />2 <br />EACH <br />3,495.00 <br />6,990.00 <br />7. <br />Common Excavation <br />50 <br />CYD <br />90.00 <br />4,500.00 <br />8. <br />9. <br />"B" Borrow <br />Temporary Erosion Control, Silt Fence <br />50 <br />910 <br />CYD <br />LFT <br />150.00 <br />1.95 <br />7,500.00 <br />1,774.50 <br />10. <br />Temporary Erosion Control <br />1 <br />LS <br />11 540.00 <br />11, 540.00 <br />11, <br />Sidewalk, Concrete, 4" <br />120 <br />SYD <br />66.UU <br />7,920.00 <br />12. <br />Sidewalk, Stamped Concrete with Integral Color, 5" <br />60 <br />SYD <br />215.00 <br />12, 900.00 <br />13. <br />Landscape Edging, Aluminum, Black <br />80 <br />LFT <br />12.40 <br />992.00 <br />14. <br />Tree, Red Maple, 2.5" <br />3 <br />EACH <br />480.00 <br />1,440.00 <br />15. <br />Tree, Commemoration Sugar Maple, 2.5" <br />2 <br />EACH <br />500.00 <br />00 <br />16. <br />Tree, American Hornbeam, 2.5" <br />2 <br />EACH <br />500.00 <br />1 , 000.00 <br />Version 1/17/2019 Contractor's Bid for Public Works - 9 <br />