BID/PROPOSAL Addendum No. 2
<br />CITY OF SOUTH BEND
<br />M48.47.
<br />4-1/c No. 8 Copper Cable
<br />2,970
<br />LFT
<br />4.20
<br />12.474.00
<br />1 112" PVC Schedule 80 for Lighting
<br />2,080
<br />LFT
<br />4.40
<br />9,152.00
<br />49.
<br />50.
<br />1 1/2" PVC Schedule 80 for Lighting, in Pile Cap
<br />1 1/2" PVC Schedule 80 for Lighting, Directionally Bored
<br />510
<br />380
<br />LFT
<br />LFT
<br />5.40
<br />10.00
<br />2,754.00
<br />3,800.00
<br />51,
<br />Light Pole Foundation
<br />29
<br />EACH
<br />620.00
<br />17, 980.00
<br />52.
<br />Light Pole and Luminaire, LED, Pedestrian Light, Furnish
<br />2
<br />EACH
<br />7,200.00
<br />14, 400.00
<br />53.
<br />Light Pole and Luminaire, LED, Pedestrian Light, Furnish
<br />and Install
<br />35
<br />EACH
<br />7,200.00
<br />252, 000.00
<br />54.
<br />TESCO Combination Cabinet and Foundation
<br />1
<br />EACH
<br />7,500.00
<br />7,500.00
<br />55.
<br />Miscellaneous Equipment for Lighting
<br />1
<br />LS
<br />3,500.00
<br />3,500.00
<br />56. ITransverse
<br />57.
<br />Pavement Marking, Paint, Stop Line, 24"
<br />Pavement Marking, Solid, Green
<br />11
<br />360
<br />LFT
<br />SFT
<br />35.00
<br />8.60
<br />385.00
<br />3,096.00
<br />58.
<br />Hardwood Mulch
<br />60
<br />CYD
<br />5,580.00
<br />Division 2: Upper Walk
<br />1,880,302.34
<br />Division 3: Lower Walk
<br />Item
<br />No.
<br />Descrit!on
<br />Quantity
<br />Unit Price
<br />Total Amount
<br />1.
<br />Construction Engineering
<br />1
<br />14 875.00
<br />14 875.00
<br />Mobilization/Demobilization
<br />1
<br />64,000.00
<br />64,000.00
<br />3.
<br />Concrete Sidewalks and Approaches, Remove
<br />810
<br />40-50
<br />32,805.00
<br />4.
<br />5.
<br />Light Pole and Foundation, Remove
<br />Tree, Remove, over 24" to 36"
<br />28
<br />1
<br />500.00
<br />2,730.00
<br />14,000.00
<br />2,730.00
<br />6.
<br />Tree, Remove, over 36" to 60"
<br />2
<br />EACH
<br />3,495.00
<br />6,990.00
<br />7.
<br />Common Excavation
<br />50
<br />CYD
<br />90.00
<br />4,500.00
<br />8.
<br />9.
<br />"B" Borrow
<br />Temporary Erosion Control, Silt Fence
<br />50
<br />910
<br />CYD
<br />LFT
<br />150.00
<br />1.95
<br />7,500.00
<br />1,774.50
<br />10.
<br />Temporary Erosion Control
<br />1
<br />LS
<br />11 540.00
<br />11, 540.00
<br />11,
<br />Sidewalk, Concrete, 4"
<br />120
<br />SYD
<br />66.UU
<br />7,920.00
<br />12.
<br />Sidewalk, Stamped Concrete with Integral Color, 5"
<br />60
<br />SYD
<br />215.00
<br />12, 900.00
<br />13.
<br />Landscape Edging, Aluminum, Black
<br />80
<br />LFT
<br />12.40
<br />992.00
<br />14.
<br />Tree, Red Maple, 2.5"
<br />3
<br />EACH
<br />480.00
<br />1,440.00
<br />15.
<br />Tree, Commemoration Sugar Maple, 2.5"
<br />2
<br />EACH
<br />500.00
<br />00
<br />16.
<br />Tree, American Hornbeam, 2.5"
<br />2
<br />EACH
<br />500.00
<br />1 , 000.00
<br />Version 1/17/2019 Contractor's Bid for Public Works - 9