My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - G. E. Marshall, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - G. E. Marshall, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:27:49 AM
Creation date
12/12/2019 10:17:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
considered incidental to the project. Topsoil required to be imported to the site shall be measured <br />and paid for under the topsoil Pay Item below. <br />10. Testing is required for imported topsoil material and reuse of onsite topsoil materials to show <br />compliance with material specifications. Testing of topsoil shall not be measured or paid for <br />directly but shall be included in the unit price for the topsoil Pay Item. <br />11. Payment will be made under: <br />Pay Item Pay Unit <br />Embankment Fill CYS <br />Excavation, Common CYS <br />SP-35. STRUCTURE EXCAVATION <br />A. State Specifications: Section 206 <br />B. Additions: <br />1. Excavation for the foundation of proposed structure footings shall be measured from the existing <br />ground surface to the base of proposed footings, except there shall be no classification of <br />foundation excavation material. <br />2. Payment will be made under: <br />Pay Item Pay Unit <br />Excavation, Foundation, Unclassified CYS <br />SP-36. TEMPORARY EROSION AND SEDIMENT CONTROL <br />A. State Specifications: 205 <br />B. City Construction Standards & Specifications: Section 7 <br />C. Additions: This work shall consist of furnishing, installing, maintaining, and <br />removing temporary erosion and sediment control measures <br />1. If any concrete is brought to the site, the Contractor shall provide concrete washout facilities of <br />adequate capacity in accordance with the project requirements. The concrete washout shall be <br />located as far from surface waters as practical and shall be able to contain all liquid and solid <br />material from concrete truck or mixer washing operations without contacting or contaminating the <br />ground. The cost associated with concrete washout shall not be paid for directly, but shall be <br />included in the costs of the concrete pay items. <br />2. All disturbed earth shall be protected to prevent erosion from occurring. Measures appropriate to <br />the season of work such as temporary mulching applications shall be maintained at all times for all <br />disturbed areas throughout the project. <br />3. If there are signs of erosion on the project, such areas shall be reworked and repaired within five <br />working days of such observation. The repair shall include an evaluation and implementation of <br />alternate measures to preclude the reoccurrence of erosion as needed. <br />4. The Contractor shall be responsible to remove soils, and any other materials that migrate from the <br />work area to downstream areas of Clyde Creek. <br />5. Payment will be made under: <br />Pay Item Pay Unit <br />Version 7/01/2018 Special Provisions - 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.