Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - G. E. Marshall, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - G. E. Marshall, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:27:49 AM
Creation date
12/12/2019 10:17:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. Existing laterals are anticipated to be in the size range of 4-6", with new lateral lines to match <br />existing size. Material for relocated laterals shall conform with City Standards. <br />4. Proposed sanitary lateral materials shall be PVC SDR 35, with a cell class of 12454 in accordance <br />with ASTM D1784. Joints shall be solvent cement type. <br />5. Proposed sanitary mainline pipe shall be PVC SDR 26 with a cell class of 12454 in accordance <br />with ASTM D 1784. Joints shall be either gasket push -on type or solvent cement type. Push -on <br />joint and gaskets shall meet the requirements for ASTM D 3139 and F 477 <br />6. The downstream connection of the proposed sanitary pipe as well as the bedding of such pipe shall <br />be per the City Standard Drawings. <br />7. Payment will be made under: <br />Pay Item Pay Unit <br />Sanitary Pipe, 8 IN LFT <br />Sanitary Lateral, Reinstate LS <br />SP-34. EXACAVATION AND FILL <br />A. State Specifications: Sections 203, 211 <br />B. Additions: <br />1. Common Excavation shall consist of all excavation, except for foundation excavation, without <br />further regards to other potential INDOT excavation classifications. <br />2. Excess common excavation material, including that resulting from required undercuts for <br />placement of subgrades or riprap, shall become the property of Contractor, to be removed from the <br />site at the expense of the Contractor. <br />3. Embankment fill material shall consist of sand B Borrow material obtained from a borrow source <br />outside the project limits. The exception shall be areas of topsoil placement for the upper six <br />inches of embankment in areas of permanent seeding. Onsite material obtained from foundation <br />excavation operations may be reused as general embankment fill if it is readily compactible and <br />meets the INDOT specification for B Borrow material. <br />4. Topsoil shall consist of natural loam, sandy loam, silty loam, silty clay loam, or clay loam humus - <br />bearing soils adapted to the sustenance of plant life and such topsoil shall be neither excessively <br />acidic nor excessively alkaline in accordance with INDOT Standard Specification 914.01. <br />Topsoil shall be screened such that 100 percent of the topsoil passes the one 1" sieve and 90 <br />percent passes the No. 10 (2.00 mm) sieve. Topsoil shall be a minimum of 4" deep and a <br />maximum of 6" deep at all locations designated on the Plans to receive permanent seeding or <br />sodding. Topsoil shall not be compacted by heavy equipment. <br />5. Embankment fill shall be compacted to at least 98 percent of its maximum standard Proctor dry <br />density (ASTM D698) under the foundations and roadways. <br />6. Excavations made for the project may require: <br />a. cut slopes adequate to prevent cave-ins/subsidence; or <br />b. braced excavations for safe construction operation. <br />7. All excavations should conform with Occupational Safety and Health Administration (OSHA) <br />requirements (i.e., 29 CFR Part 1926). The Contractor is solely responsible for constructing and <br />maintaining stable excavations. <br />8. Soil should not be stockpiled immediately adjacent to the top of the excavation. <br />9. Topsoil obtained from within the site limits shall not be measured or paid for directly but shall be <br />Version 7/01/2018 Special Provisions - 14 <br />