Laserfiche WebLink
otherwise. <br />2. Disposal of debris resulting from any clearing or removal operations shall be at an off -site area, <br />provided by the Contractor and approved by the Owner. No debris shall be left overnight. <br />3. The Contractor shall confirm the nature of any trees or shrubs to be removed within the project <br />limits prior to the deadline for questions prior to Bid Opening, regardless of whether such <br />vegetation is designated specifically on the Plans. <br />4. Tree removal Pay Item shall include the trees, including stumps, indicated on the Plans for trees <br />with diameter greater than 2" at breast height without regard to tree diameter. Trees with a <br />diameter less than 2" shall be paid for under the clearing and grubbing Pay Item. <br />5. Tree removal shall include grinding of stumps to a minimum level of three feet below proposed <br />grade or complete removal for stumps that would conflict with the proposed structure or structure <br />wingwalls. <br />6. Stump holes shall be backfilled and compacted with embankment material. Stump hole <br />embankment shall not be paid for directly in the cross -sectional areas of earthwork quantities, but <br />shall be considered incidental to the project. <br />7. Asphalt pavement removal shall not be measured directly but shall be considered incidental to <br />common excavation. <br />8. Saw cuts are required at the terminal joining of new pavement to existing pavement. Full depth <br />saw cuts are also required at the full depth pavement removal extents. Saw cutting will not be <br />measured or paid for directly, but shall be considered incidental to the work. <br />9. Payment will be made under: <br />Pay Item Pay Unit <br />Clearing and Grubbing LS <br />Tree, Remove EACH <br />Concrete Pavement, Remove SYS <br />Curb, Remove LFT <br />A. State Specifications: None <br />B. Additions: <br />1. Horizontal locations of known utilities are shown on the Plans based upon painted or flagged <br />markings from the respective utilities. Nominal variation from painted or flagged markings to <br />actual locations should be expected by the Contractor. <br />2. Elevations and sizes of existing sanitary mainline facilities shown on Plans are based on straight <br />line interpolation between surveyed inverts at manhole structures. <br />3. Depths of remaining utilities shown on Plans are unknown, including sanitary laterals. Any <br />vertical representation of existing utility facilities other than sanitary lines are for the benefit of the <br />Contractor to illustrate general locations for conflict exploration. <br />4. The Contractor is responsible for determining the actual vertical elevation of existing sanitary <br />laterals, sanitary main line and water utilities shown on the Plans through potholing. <br />5. Construction drawings showing new construction and existing facilities should be present and <br />utilized during potholing activities. Construction drawings should be compared to <br />Version 7/01/2018 Special Provisions - 12 <br />