Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - G. E. Marshall, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - G. E. Marshall, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:27:49 AM
Creation date
12/12/2019 10:17:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
otherwise. <br />2. Disposal of debris resulting from any clearing or removal operations shall be at an off -site area, <br />provided by the Contractor and approved by the Owner. No debris shall be left overnight. <br />3. The Contractor shall confirm the nature of any trees or shrubs to be removed within the project <br />limits prior to the deadline for questions prior to Bid Opening, regardless of whether such <br />vegetation is designated specifically on the Plans. <br />4. Tree removal Pay Item shall include the trees, including stumps, indicated on the Plans for trees <br />with diameter greater than 2" at breast height without regard to tree diameter. Trees with a <br />diameter less than 2" shall be paid for under the clearing and grubbing Pay Item. <br />5. Tree removal shall include grinding of stumps to a minimum level of three feet below proposed <br />grade or complete removal for stumps that would conflict with the proposed structure or structure <br />wingwalls. <br />6. Stump holes shall be backfilled and compacted with embankment material. Stump hole <br />embankment shall not be paid for directly in the cross -sectional areas of earthwork quantities, but <br />shall be considered incidental to the project. <br />7. Asphalt pavement removal shall not be measured directly but shall be considered incidental to <br />common excavation. <br />8. Saw cuts are required at the terminal joining of new pavement to existing pavement. Full depth <br />saw cuts are also required at the full depth pavement removal extents. Saw cutting will not be <br />measured or paid for directly, but shall be considered incidental to the work. <br />9. Payment will be made under: <br />Pay Item Pay Unit <br />Clearing and Grubbing LS <br />Tree, Remove EACH <br />Concrete Pavement, Remove SYS <br />Curb, Remove LFT <br />A. State Specifications: None <br />B. Additions: <br />1. Horizontal locations of known utilities are shown on the Plans based upon painted or flagged <br />markings from the respective utilities. Nominal variation from painted or flagged markings to <br />actual locations should be expected by the Contractor. <br />2. Elevations and sizes of existing sanitary mainline facilities shown on Plans are based on straight <br />line interpolation between surveyed inverts at manhole structures. <br />3. Depths of remaining utilities shown on Plans are unknown, including sanitary laterals. Any <br />vertical representation of existing utility facilities other than sanitary lines are for the benefit of the <br />Contractor to illustrate general locations for conflict exploration. <br />4. The Contractor is responsible for determining the actual vertical elevation of existing sanitary <br />laterals, sanitary main line and water utilities shown on the Plans through potholing. <br />5. Construction drawings showing new construction and existing facilities should be present and <br />utilized during potholing activities. Construction drawings should be compared to <br />Version 7/01/2018 Special Provisions - 12 <br />