5. IOLD BUSINESS <br />a. Two 100 -amp meter installation: Commission approval <br />ADDITIONAL CHARGES <br />was requested to rescind previous Commission approval <br />APPROVED FOR METER <br />of September 6, 1974, for electrical power hook -ups, <br />INSTALLATIONS ON <br />per Mr. Louis N. Wilcox, from Indiana & Michigan Elec- <br />RIVER BEND PLAZA, <br />tric Company, for approximately $500.00, and in lieu <br />R -66 <br />thereof are requesting Commission authorization for <br />S. <br />two 100 -amp meter installation, in amount of $825.00, <br />St. <br />from Colip Bros. Electric, Inc., on the Plaza across <br />from the Sherland Building, R -66. This is to cover <br />charges on Colip Bros. Electric, Inc.`s Invoice No. <br />0154, in amount of $825.00. <br />Indiana & Michigan Electric Company cannot contract <br />the work direct. <br />On motion by Mr. Wiggins, seconded by Mr. Chenney and <br />unanimously carried, the above was authorized, as <br />noted. <br />Rehabilitation work in LaSalle Park: Commission ap- REHABILITATION <br />proval was requested to award the bid for the correc- CONTRACT AWARDED TO: <br />tion of rehabilitation work on Parcel Nos. 38 -16, ROSELAND CONSTRUCTIO <br />38 -17 and 38 -18, in the LaSalle Park Urban Renewal INC., (PARCELS 38 -16 <br />Project, Indiana R -57, received from Roseland Con- 38 -17 & 38 -18), R -57 <br />struction Company, Inc., totalling $13,937.00, as <br />follows: <br />301 <br />S..Iowa <br />St. <br />$ 3,243.00 <br />305 <br />S. <br />Iowa <br />St. <br />4,014.00 <br />309 <br />S. <br />Iowa <br />St. <br />62'680.00 <br />Total $13,937.00 <br />The contract for the above rehabilitation work was <br />awarded prior to the low bidder, Circle Lumber, Inc., <br />in bid amount of $11,499.00, with the stipulation that <br />because of the nature of the contract and the difficulty <br />in the refurbishing work, the first contract will be reviewed <br />for consideration of a time and materials plus 15% contract <br />on the other two parcels. This was authorized by Commissioners <br />in meeting of August 16, 1974. <br />After working with Circle Lumber to enter into a contract, <br />they withdrew their bid in letter dated September 24 as <br />discussed and noted in Commission meeting of October 4, <br />advising us that after much deliberation they decided they <br />had better turn down the three (3) jobs on Iowa Street, as <br />they felt they could not satisfy the owners. <br />Woodcox Building Contractor, Inc., in their letter dated <br />October 16, advised due to existing conditions, they do not <br />feel they can give a firm bid to restore the homes. The <br />only possible way would be on a cost plus basis. They feel <br />they can restore the homes but that there are many uncertain <br />factors which could not be priced out with any exactness. <br />- 5 - <br />