Laserfiche WebLink
4. <br />e <br />ICATIONS (Cont'd <br />Grant Progress Payment on our Contract Indiana A- 10(LG), <br />transmitted with our letter of August 9, 1974, has been <br />approved in the amount of $965,800.00. This payment <br />has been reduced to this amount to remain within the <br />amount of the executed loan and grant contract. <br />Enclosed was S.F. 1096 indicating setoffs for out- <br />standing direct temporary loans plus interest which <br />have been made against the approved payments. Since <br />there is no remaining balance of the progress payments, <br />we will not receive a check pursuant to the approved <br />payments. <br />HUD letter 'dated September 11; 1974: This letter, <br />over the signature of Mr. Robert W. Dew, Supervisory <br />Construction Analyst (Cost), confirms their telephone <br />conversation of September 10th, that they would not be <br />in a position to recommend the release or withholding <br />of payments to Exterior Designing, Inc., for the <br />reasons outlined in their three -page letter. <br />Mr. Lennon advised this is as a result of internal in- <br />vestigation. We were withholding one of the payment <br />claims for the landscape contract on the River Bend <br />Plaza until some potential wage violations or other <br />conduct was taken care of by Mr. Burroff for payment. <br />An investigative team did investigate it from HUD, <br />and they are of the opinion that we no longer should <br />hold their checks as they are in accordance now with <br />the necessary documents. We have released authoriza- <br />tion for claim payment and the Redevelopment Commis- <br />sioners are signing it today for the firm. <br />Indiana Bell Telephone Company, Inc. letter dated <br />September 11, 1974: This letter, over the signature <br />of Mr. E. R. Hennon, Engineering Manager, advises <br />of the relocation work in the downtown urban renewal <br />area and the billing enclosed. The previous billing <br />was presented to us in their letter dated January 3, <br />1974. <br />The billing is submitted on Estimate 7692 and a portion <br />of the work is still in progress; therefore, the amount <br />billed includes an estimated amount for that portion <br />which has not been completed. Also attached were <br />copies of the work prints and the estimated construc- <br />tion costs of Estimate 7692. The portion of the <br />construction work is outlined which was used in de- <br />termining the reimbursable amounts. The plant better- <br />ment involved is partially reimbursable. They also <br />show the portion of their construction work that was <br />considered non - reimbursable. The breakdown of the <br />costs associated with their work shows the total cost, <br />less plant betterment, less non - reimbursable and the <br />reimbursable cost to our department. <br />EXTERIOR DESIGNING, <br />INC., R -66 <br />INDIANA BELL <br />TELEPHONE CO., INC., <br />RELOCATION, R -66 <br />