My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 12-07-73
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1973
>
RM 12-07-73
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2012 10:22:14 AM
Creation date
9/20/2012 11:19:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. <br />This <br />tion <br />amour <br />in ti <br />NEW BUSINESS (Cont'd) <br />f. Change Order No. 5 to Phase II, -B; Contract A & B: CHANGE ORDER NO. 5 <br />contract is with Arco Engineering Construction Corpora- TO PHASE II -B, <br />and the change order is for an increase in contract CONTRACT A & B, <br />it of $25,147.32, with no change of completion time, APPROVED, R -66 <br />ie R -66 Project. <br />Exteiisive research covered this item: <br />Change Order Item No. 1: Increase to cover <br />overruns not covered in Change Orders <br />1 -4. 1 $ 8,607.32 <br />Change Order Item No. 2: Construct 10" <br />concrete bridge approach. 2,500.00 <br />Change Order Item No. 3: Costs of maintain- <br />ing traffic to parking structure not <br />indicated in the contract and agreed <br />upon incidental work requested by <br />Arco. 13,500.00 <br />,Change Order Item No. 4: Remove pavement <br />to depths of 3' around street car <br />ties. 540.00 <br />Total $25,12r7 .32 <br />TheSE were itemized in detail with copies to the Commission <br />and read by Mr. Lennon. The work was included in the ori- <br />ginal plan but not in the contract. The Department of <br />Public Works has requested we put in the bridge approach <br />as called for in the original plan, per Bill Slabaugh. The <br />conc ete bridge approach was put in four parts to keep the <br />traf is flowing on St. Joseph Street and to have at least one <br />lane open on Colfax. <br />These are all legitimate costs and documented in work log. <br />This is the finalization of the contract. These charges all <br />occurred before January 1 of this year. Letter had been sub- <br />mitt Ed to Arco if they would complete their construction with <br />haste in spring after all the rain we had last fall, we would <br />then consider all these items. <br />On motion by Mr. Wiggins, seconded by Mr. Chenney and unani- <br />mous] carried, Change Order No. 5 to Phase II -B, Contract A <br />& B, was approved for an increase in contract amount of <br />$25,147.32, with no change of completion time, R -66. <br />with <br />is fc <br />the 1 <br />g. Change Order No. 13 to Phase I: This contract is CHANGE ORDER NO. 13 <br />Rieth -Riley Construction Co., Inc. and the change order TO PHASE I CONTRACT <br />r a decrease in contract amount of $11,714.32. This is APPROVED, R -66 <br />inal report on Phase I, underruns. <br />- 14 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.