Laserfiche WebLink
excluded from the scope of this task and will be provided under separate authorization by <br />the City. <br />Deliverables: <br />Deliverables with this task include up to three (3) supplementary drawings and/or <br />specifications required for clarification only. <br />4.5 :Punch. Dist l cvclo pent: Perform a site visit to identify punch list items. Project Manager, <br />Project Engineer and Instrumentation and Controls Engineer to perform the site visit. <br />Deliverables: <br />Deliverables with this task include a punch list. <br />4.6 record Drawings: Revise original construction drawings to reference changes reported to <br />the Resident Project Representative during construction. Incorporate changes shown on the <br />Contractor's and the Resident Project Representative's record sets of drawings, <br />supplementary drawings, and other records of field changes. Submit to the City. <br />Deliverables: <br />Deliverables with this task include two (2) paper copies (2406) of the record drawings, a PDF <br />of the record drawings and the electronic AutoCAD files within three (3) months of final <br />completion of the project. <br />A1.05 On -Call Design Services <br />5.1 Contractor's Claim Review: Review contractor claims and provide recommendations for <br />disposition. This task will be performed on an as needed basis upon request from the City of <br />South Bend. <br />Deliverables: <br />Deliverables for this task include requests for proposals to be submitted to the Contractor to <br />obtain cost for changes and/or work change directives to describe changes to the Contractor. <br />Deliverables also include final change order documentation. <br />5.2 Evaluation ofExisting Gas Cleaning Skid System: Review documentation submitted by <br />Guild Associates related to the gas cleaning skid system and provide recommendations for <br />possible upgrades or repairs to the system. This task will be performed on an as needed <br />basis upon request from the City of South Bend. <br />Page 6 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright OO 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />