My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement - Engineering & Design Services for CNG Compressor Upgrade at Wastewater Plant - Greeley and Hansen, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Agreement - Engineering & Design Services for CNG Compressor Upgrade at Wastewater Plant - Greeley and Hansen, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:07:30 PM
Creation date
12/2/2019 1:48:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Deliverables: <br />Deliverables for this task include a memorandum with technical opinion of equipment or <br />system and recommendations for upgrades or repairs for each system. <br />A1.06 Proposed Project Schedule, Drawing List, and Specification List <br />6.1 Proposed Project Schedule- The proposed project schedule is arranged to accomplish <br />construction completion for August 31, 2020. <br />Design <br />• 11-26-19: Board of Public Works approval of professional design services. <br />• 11-26-19 to 02-11-20: Design Period — PDR and Final Design <br />• 02-25-20: Board of Public Works, Title Sheet, Request or Advertise <br />• 02-28-20 and 03-06-20: Public Advertisements <br />• 03-24-20: Bid Opening <br />• 04-01-20: Bid Award <br />Construction / Construction Administration <br />• 04-01-20 to 08-12-20: Contracts, Shop Drawings, Equipment Procurement <br />• 08-10-20 to 11-12-20: Construction Period <br />6.2 Proposed Drawing List: <br />• Cover Sheet <br />• General Mechanical Sheet <br />• General Electrical Sheet <br />• General Instrumentation Sheet <br />• Site Plan with Survey and Utilities Location <br />• Site Demolition Plan <br />• Site Grading and Paving Plan <br />• Site Details <br />• Digester Gas Cleaning P&ID <br />• CNG Fueling System Process Flow Diagram <br />• Mechanical — Sequence for Construction and Operation <br />• Mechanical — Digester Gas Cleaning System Demolition and Piping Modifications <br />• Mechanical — CNG Fueling Area Demolition and Piping Modification <br />• Electrical — Site Plan <br />• Electrical — One Line Diagram <br />• Electrical — CNG Fueling Area Power Plan <br />Page 7 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.