Laserfiche WebLink
Deliverables: <br />Deliverables for this task include a memorandum with technical opinion of equipment or <br />system and recommendations for upgrades or repairs for each system. <br />A1.06 Proposed Project Schedule, Drawing List, and Specification List <br />6.1 Proposed Project Schedule- The proposed project schedule is arranged to accomplish <br />construction completion for August 31, 2020. <br />Design <br />• 11-26-19: Board of Public Works approval of professional design services. <br />• 11-26-19 to 02-11-20: Design Period — PDR and Final Design <br />• 02-25-20: Board of Public Works, Title Sheet, Request or Advertise <br />• 02-28-20 and 03-06-20: Public Advertisements <br />• 03-24-20: Bid Opening <br />• 04-01-20: Bid Award <br />Construction / Construction Administration <br />• 04-01-20 to 08-12-20: Contracts, Shop Drawings, Equipment Procurement <br />• 08-10-20 to 11-12-20: Construction Period <br />6.2 Proposed Drawing List: <br />• Cover Sheet <br />• General Mechanical Sheet <br />• General Electrical Sheet <br />• General Instrumentation Sheet <br />• Site Plan with Survey and Utilities Location <br />• Site Demolition Plan <br />• Site Grading and Paving Plan <br />• Site Details <br />• Digester Gas Cleaning P&ID <br />• CNG Fueling System Process Flow Diagram <br />• Mechanical — Sequence for Construction and Operation <br />• Mechanical — Digester Gas Cleaning System Demolition and Piping Modifications <br />• Mechanical — CNG Fueling Area Demolition and Piping Modification <br />• Electrical — Site Plan <br />• Electrical — One Line Diagram <br />• Electrical — CNG Fueling Area Power Plan <br />Page 7 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />