Laserfiche WebLink
3.2 Pre -Bid Meeting: Project Manager and Project Engineer will attend and conduct one (1) pre -bid <br />meeting and prepare meeting notes. <br />Deliverables: <br />Deliverables with this task include a meeting agenda provided 3 days in advance of the meeting <br />to the City Project Manager and meeting notes to be provided to the City Project Manager <br />within 5 working days of the pre -bid meeting. <br />A1.04 Construction Office Services <br />4.1 Submittal Review: Review up to 20 shop drawings and/or product submittals for <br />compliance with the design concept as expressed in the Contract Documents. Invoice the <br />costs associated with review of third and subsequent submittals separately from the other <br />tasks. Costs associated with review of third or subsequent submittals are not included in the <br />compensation set forth in this Agreement for Professional Engineering Services and are to <br />be compensated for as additional services. <br />Deliverables: <br />Deliverables with this task include a letter of transmittal, with review remarks, to the <br />Contractor for each submittal with a copy issued to the City. <br />4.2 Progress Meetings: Attend monthly progress meetings (up to 8) during the duration of the <br />project. Project Manager or Project Engineer to attend progress meetings. <br />Deliverables: <br />Deliverables for this task include meeting agendas provided 3 days in advance of the <br />meeting to the City Project Manager. Review and comment on the meeting notes provided <br />by the Contractor. <br />4.3 Gencral Adininistration:: Respond to inquiries from the Contractor and the City relative to <br />interpretation of the drawings and specifications, and other matters concerning construction. <br />Project scope is based upon providing responses for up to twenty (20) Contractor requests <br />for information (RFIs). <br />Deliverables: <br />Deliverables with this task include responses to RFIs. <br />4.4 Su . lenientar Drawings Prepare up to three (3) supplementary drawings and <br />specifications as needed for clarification of the Contract Documents. Design changes are <br />Page 5 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />