My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement - Engineering & Design Services for CNG Compressor Upgrade at Wastewater Plant - Greeley and Hansen, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Agreement - Engineering & Design Services for CNG Compressor Upgrade at Wastewater Plant - Greeley and Hansen, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:07:30 PM
Creation date
12/2/2019 1:48:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Deliverables: <br />Deliverables for this task include an opinion of probable construction cost to be provided <br />one week before the 50% and 90% design meetings. <br />F. Review Meetill .s: Conduct design review meetings at the 50% and 90% design <br />completion stages as described below. The Project Manager and Project Engineer will <br />attend the review meetings. <br />Deliverables: <br />Deliverables for this task include meeting agendas provided three days in advance of the <br />meeting to the City Project Manager and meeting notes provided 5 working days after each <br />meeting to the City Project Manager. <br />G. Final Documents "oordiliation: Following the incorporation of comments identified <br />during the 90% design review, provide Final Design Drawings and Specifications. <br />Coordinate with a firm hired by the City for contract document printing and distribution <br />to prospective bidders. <br />Deliverables: <br />Deliverables for this task include one electronic PDF set of Final Design Drawings and <br />Project Manuals, Three (3) sets of 11x17 Final Design Drawings, Three (3) sets of 2406 <br />Final Design Drawings, and five (5) sets of Project Manuals. <br />H. Quality Control: Perform a quality control review of the design at the 50% and 90% <br />design levels, addressing conformance with applicable regulations, standards and codes, <br />constructability, and biddability. Quality control review comments will be addressed in <br />the design drawings. <br />Deliverables: <br />There are no deliverables associated with this task <br />A1.03 Bid Assistance <br />3.1 Bidder Inquires and Addenda: Respond to bidders' inquiries during the bidding period. Prepare <br />addenda to clarify the Contract Documents as necessary. <br />Deliverables: <br />Deliverables with this task include addenda addressing contract document updates, as needed. <br />Page 4 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.