My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement - Engineering & Design Services for CNG Compressor Upgrade at Wastewater Plant - Greeley and Hansen, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Agreement - Engineering & Design Services for CNG Compressor Upgrade at Wastewater Plant - Greeley and Hansen, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:07:30 PM
Creation date
12/2/2019 1:48:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Deliverables: <br />Deliverables for this task include one (1) electronic PDF set each of 50% and 90% general <br />and piping and equipment drawings, 50% and 90% piping and equipment specifications, <br />and 50% and 90% cost opinions (incorporating cost opinions for all disciplines). 50% <br />drawings to include site plan, demolition plans, new work plans. 90% to include demolition <br />sections, new work sections and details. <br />B. Electrical Improvements <br />1) Prepare electrical design for power to instruments. <br />Deliverables: <br />Deliverables for this task include one (1) electronic PDF set each of 50% and 90% electrical <br />drawings, 50% and 90% electrical specifications, 50% and 90% electrical cost opinion <br />(incorporated in overall cost opinion). 50% drawings to include one -line diagram. 90% <br />drawings to include wiring diagrams, conduit and cable schedules and details. <br />C. lllstrumentation and Control fire ai ovetnents <br />1) Provide process flow diagram for vehicle fueling station. Update digester gas <br />cleaning system P&ID. <br />Deliverables: <br />Deliverables for this task include one (1) electronic PDF set each of 50% and 90% <br />instrumentation and control drawings, 50% and 90% instrumentation and control <br />specifications, and 50% and 90% instrumentation and control cost opinion (incorporated in <br />overall cost opinion). <br />D. Constraints„ Develop construction constraints to minimize gas cleaning and CNG <br />fueling disruptions. <br />Deliverables: <br />Deliverables for this task include constraints to be included in the Summary of Work <br />specification to be submitted one week before the 50% and 90% design meetings. <br />E. Cost Opinjoi s. Prepare updated construction cost opinions at 50% and 90% design <br />completion stages based upon the respective drawings and specifications. <br />Page 3 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.