Laserfiche WebLink
6. NeW BUSINESS (Cont'd <br />Commission authorization is requested to order the traffic <br />signa s, common work and light standards -- whether we go <br />one-way or two -way. The Jefferson Boulevard situation <br />on whether it will become two -way or one -way is pending. <br />Mr. R land Kelly advised a change in the traffic pattern <br />on Je ferson Boulevard would affect their organization <br />and t ey would want to take a look at situation and make a <br />presentation on it if we contemplate a change in traffic <br />structure. <br />On motion by Mr. Chenney, seconded by Mr. Wiggins and unani- <br />mously carried, Mr. Oesterling was authorized to proceed on <br />the traffic signals, common work and light standards needed <br />as discussed. <br />k. Change Order No. 4 to Contract No. 5, R -66: Com- CHANGE ORDER NO. 4 <br />mission approval was requested for Change Order No. 4 to TO CONTRACT NO. 5 <br />Contract No. 5 with The Hickey Company, Inc., Phase III, R -66, APPROVED, R -66 <br />for Office Engineer's sidewalk, for an increase in contract <br />amount of $927.00. <br />Bids w�re received from the following: <br />Th Hickey Company, Inc. $ 937.00 <br />H. G. Christman Construction <br />Co., Inc. 1,400.00 <br />The th'rd contractor was not interested in bidding. The work <br />entail the replacement of the sidewalk on Michigan Street, in <br />front f Karl King's Store, an area 141 x 18' both sides: <br />2 # 14' x 18' = 56 S.Y. <br />To <br />To <br />To <br />To <br />Mr. Let <br />both s- <br />tional <br />remove existing walk <br />56 <br />x $1.75 = <br />$ 98.00 <br />remove existing curb <br />28 <br />x $ 1.10 <br />= 31.00 <br />replace walk <br />56 <br />x $ 9.00 = <br />504.00 <br />replace curb <br />28 <br />x $10.50 = <br />294.00 <br />Total .................. 9 7.0 <br />non advised this is on Karl King's property in alley on <br />des of Michigan Street. The plan did not call for addi- <br />sidewalks to be placed in front of that building. <br />On mot on by Mr. Chenney, seconded by Mr. Wiggins <br />mously carried, Change Order No. 4 to Contract No. <br />The Hi key Company, Phase III, R -66 was authorized <br />increa a in contract price of $927.00. <br />- 14 - <br />and unani- <br />5 , with <br />for an <br />