Laserfiche WebLink
6. N8W BUSINESS (Cont'd <br />Mr. Chenney advised the details always <br />take preference over what the plan shows; <br />if the plan doesn't show the change, you <br />a ways go by the detail. Whoever did the <br />e ectrical is at fault. $ 407.78 <br />3) R vising Watt meter housing relocation. <br />T is is additional conduit and wiring, <br />t relocate. 906.00 <br />4) Service Valves for 34 Box Hydrants <br />@ $60.31 each. Shut off valves were needed <br />for replacements. 2,050.54 <br />5) Revision of five (5) Haws Drinking Fountains. <br />T o were set up in our specifications ori- <br />g nally. Simonds left off "FP" in typing <br />aid we needed five additional hydrants that <br />were freezeproof. 1,029.00 <br />6) Revising pool drainage system, increase to <br />contract. Contractor felt it is better to <br />have a valve in pool to shut off, instead of <br />c imbing in. 2,348.00 <br />7) Revising pit intake and exhaust vent loca- <br />t on, requesting increase in contract for <br />$1,044.00. CEW feels this revision should <br />be credited to owner since we only require <br />an exhaust fan in lieu of both supply and <br />e haust fans. Therefore, balance due is <br />z ro . - <br />Total increase ........... $ 7,391.72 <br />On motion by Mr. Chenney, seconded by Mr. Wiggins and unani- <br />mous) carried, Change Order No. 3 to Contract No, 5, Phase <br />III, -66, with The Hickey Company, Inc., was approved for <br />an increase in contract amount of $7,391.72. <br />j. Jefferson Street Alternate to Contract No. 5; R -66: <br />Mr. L nnon advised the Jefferson Street Alternate was an alter- <br />nate in the basic bid. We received three (3) bids: <br />The Hickey Co., Inc. $31,000 <br />Schumacher - Stafford Joint Venture 50,500 <br />C. J. Reinke & Sons, Inc. 65,427 <br />This includes nine (9) bus shelters needed and included on <br />the drawings. $30,000 pool,normal lighting and traffic signals. <br />Prior discussions were on whether Washington Street should be <br />closed,a two -sway system for Jefferson Street on closing Washing- <br />ton Street - -a master transportation plan was considered for an <br />altern to bid. <br />- 13 - <br />TRAFFIC SIGNALS, <br />COMMON WORK & <br />LIGHT STANDARDS <br />AUTHORIZED, PHASE II <br />JEFFERSON STREET <br />ALTERNATE, R -66 <br />