My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 05-04-73
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1973
>
RM 05-04-73
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2012 10:26:50 AM
Creation date
9/12/2012 3:53:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. PROGRESS REPORTS (Cont'd) <br />cates that the pool and gardens originally planned are <br />proceeding on schedule. As of this date, we have not <br />heard from the Post Office authorities with regard to <br />proposed revisions to the original plan. <br />6. Interior work on all floors proceeding at Royal Inns <br />Motel, including painting and decorating, glazing, floor <br />covering, furniture and furnishings. Site grading under- <br />way prior to installing driveways, parking lots, and final <br />landscaping. <br />7. Barracades in place for store front renovation at Bob's <br />Jewelry space, 106 North Main Street, work to include <br />new front and entranceway, new show window and display <br />casework and interior decorating. <br />8. Preliminary plans are in progress for the proposed I.B.M. <br />Tower adjacent to the St. Joseph Bank and Trust Company <br />along St. Joseph Street. Site plans call for a building <br />of approximately six (6) stories on a plot 66' x 150'. <br />d. Merry Avenue Progress Report: Mr. Lawrence E. Wartha, MERRY AVENUE <br />Ad inistrative Assistant to the Executive Director, submitted PROGRESS REPORT <br />his written status of this Project. The update is: <br />Relocation 90% of occupants physically relocated. <br />Acquisition 85% of occupied properties acquired. <br />Demolition First contract awarded 11- 17 -72. <br />Actual work began 12 -1 -72. 80% of <br />land cleared. <br />Condemnation Six suitsfiled. Three notices sent. <br />Vacation of streets and alleys: Public Hearing by Board <br />of Public Works and Safety 12- 11 -72. <br />Vacation Brief and record same: Recorded 12- 29 -72. <br />Rezoning Scheduled for mid April. <br />e. Property Management Report: Mr. John A. Kotzen- <br />mac er, Director of Property Management, submitted a written <br />rep rt for the month of April: <br />Total rent receipts collected for the month of April, 1973 <br />was: $6,274.51. <br />One tenant, Crowley Realty Corporation, vacated on April <br />14, 1973. <br />- 13 - <br />PROPERTY MANAGEMENT <br />REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.