My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 09-01-72
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1972
>
RM 09-01-72
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2012 10:33:28 AM
Creation date
9/12/2012 1:14:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. ROGRESS REPORTS (Cont'd) <br />1) ulm Construction Company is installing new heating <br />ines in the conversion plant air handling system <br />o serve Morris Civic Auditorium and progressing <br />n schedule. Sidewalks being replaced this week, <br />oiler room to be completed in two weeks, entire <br />nstallation to be operable in five to six weeks. <br />2) rumville - Guitarland grand opening was held first <br />eek in August. Installation of new illuminated <br />ign panel by South Bend Neon Company will complete <br />1he work. <br />3) ilady Shop, 121 -23 -25 N. Michigan Street; re -roof- <br />ng and waterproofing work is now in progress. <br />4) yman's Dept. Store, 103 N. Michigan Street: Vault <br />area under sidewalk being reconstructed for air intake <br />rilles for new air handling system -- barricades in <br />lace by Schumacher Construction Company. <br />5) Bids received for new retail store building to be <br />rected at Wayne and Michigan corner; ground breaking <br />eld on August 22; construction to start on or be- <br />ore September 15, 1972. <br />6) Family Book Store, 124 S. Michigan Street: Roof fram- <br />ing completed and store front being installed. <br />7) louse of Fabrics, 110 S. Michigan; Hardy Shoes, 108 S. <br />Michigan Street: Heating ducts being installed from <br />adjacent store building to provide interim heat for <br />coming season, pending disposition of rehabilitation <br />proposals for building. <br />8) 206 S. Michigan Street (Adjacent to State Theatre Bldg.): <br />Tans in progress by architect Oliver Ogden for new re- <br />ail store building, one story in height. <br />9) Royal Inns Motel: Temporary building permit was issued <br />t begin site preparation and excavation work. Founda- <br />tion work started on the 150 -room motel. <br />tion <br />Augus <br />pleti <br />, Merry Avenue Project: Mr. Larry Wartha, in addi- MERRY AVENUE PROJECT <br />:o the previous report's activities, received on <br />: 18 two complete sets of appraisals. Stage of com- <br />)n : <br />Prepare final Project budget 50% <br />Prepare Part I -II application to HUD 80% <br />Physical relocation of residents 5% <br />- 12 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.