My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 06-02-72
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1972
>
RM 06-02-72
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2012 10:34:45 AM
Creation date
9/12/2012 12:34:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. <br />Bauj <br />porf <br />PROGRESS REPORTS (Cont'd) <br />Firms moving to new locations <br />Community News Stand, #3 -14 5 -26 -72 <br />Fannie May Candies, #9 -2 5 -31 -72 <br />Capitol Hearing Aid, #6 -2 5 -24 -72 <br />b. Downtown Rehabilitation, R -66: Mr. Edwin R. DOWNTOWN REHABILITA- <br />!r, Reha > itation Architect, submitted a written re- TION, R -66 <br />for May's activities: <br />Sto e renovation in progress at 127 N. Michigan Street, <br />whi h will have a new store front facing Michigan Mall <br />and a new entranceway at rear service drive, Polk Court. <br />Interior and exterior work is completed at the old Ameri- <br />can Bank building, with exception of approved sign not <br />yet installed. Two tenants, relocated and operating, <br />and third tenant to move in this week. Clock will have <br />a face lift and new sign. <br />The new Sherland Building is continuing work on upper <br />flo rs, corridors, office and building facilities. <br />Site demolition virtually completed at 124 S. Michigan <br />Street. Muia Construction Company is apparent low bidder <br />to onstruct space for the Family Book Store at same site. <br />Following Mall site preliminary plans for building and <br />site development have been received for: <br />208 -210 S. Michigan Street properties adjacent <br />to State Theatre and facing the St. Joseph Bank <br />and Trust Arcade - -three tenant occupancy. <br />301 -305 S. Michigan Street at Wayne for a one - <br />story building - -four tenant occupancy. <br />401 -415 S. Michigan Street at Western Avenue <br />for a one -story building- -small truck terminal, <br />distribution office, and retail outlet for local <br />news agency. <br />Abo a proposals are subject to Commission approval, <br />Urb n Design review and Sign Committee action. <br />Dev toper interest centers on West Washington Street <br />bet een Michigan Street and Main Street, both sides <br />of treet, as properties become available. <br />=I! <br />
The URL can be used to link to this page
Your browser does not support the video tag.