Laserfiche WebLink
#2 stone and Geogrid Northside <br />#2 stone delivered = $5966 <br />2 rolls geogrid = $1168 <br />Excavator 7 hrs x 170/hr = $1190 <br />Laborer 2 hrs x 80/hr = $ 160 <br />Markup = $848.40 <br />Bond = $186.65 <br />_ $9519.05 <br />Winter Concrete Adjustments <br />700 CYi)s @ $2.25 = $1575.00 <br />Grand Total = $133,724.31 <br />Total for CO #2 = $133, 724.31 <br />