My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Western Ave. Streetscape, Phase III Proj No 118-076 - Indiana Earth, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 2 - Western Ave. Streetscape, Phase III Proj No 118-076 - Indiana Earth, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:55:06 PM
Creation date
11/14/2019 10:29:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Kentucky Street <br />Pavement Removal 242 SYS @ 5.61= $1357.62 <br />HMA Base #440 = 92 TONS @ 71.00= $6532.00 <br />53s 6" = 104 TON @ 26.41= $2746.64 <br />Patching #880 = 100 TON @ 152.00 =-($15,200) <br />Total =-($4563.74) <br />Drywells <br />Drywell, fabric, stone, casting adjusting rings, equip and labor. 3 each at $5,370/each = $18,075.00 <br />Storm Adjustments for getting around Duct bank <br />Includes coring, boots, 8" DIP, new catch basin to replace MH = $11,568.00 LS <br />Savings from MH =-$3,085 <br />Savings from 12" storm pipe 68' @ $25.35 =-$1,723.80 <br />Total = $6759.20 <br />Duct bank concrete slab and footings at Lake Street <br />RRiley labor = $1.851.41 <br />Rebar & Concrete = $2,378.88 <br />RRiley equip/misc. _ $124.71 <br />Sub to do rebar = $385 <br />IE Labor & equip = $500 <br />Plastic = $100 <br />Markup = $534 <br />Bond = $106.80 <br />Total: $5,446.80 LS <br />
The URL can be used to link to this page
Your browser does not support the video tag.