My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Western Ave. Streetscape, Phase III Proj No 118-076 - Indiana Earth, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 2 - Western Ave. Streetscape, Phase III Proj No 118-076 - Indiana Earth, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:55:06 PM
Creation date
11/14/2019 10:29:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rytY4 14d <br />V'` DEPARTMENT OF PUBLIC WORKS <br />' DIVISION OF ENGINEERING <br />Project Number: Project Name: Western Ave Streetscpape Phase 3 Change Order #: 2 <br />DATE INITIATED: 11/01/2019 BPW DATE <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Additional work that was needed to update or add to existing items based on quantities used <br />during phases 1 and 2. Also necessary changes to storm sewer system, and to improve pavement <br />integrity on the side streets coming into Western Avenue. This change order also includes the use <br />of a transfer machine for paving asphalt and two different sanitary repairs to the existing main due <br />to collapse. This CO should also include a time extension of 6 days. 1 day for sanitary repair at <br />Falcon, 3 days for sanitary repair at Lake, and 2 days for installing new manholes and catch basins <br />Attachments: (List documents support change — required) <br />N/A <br />Amount of BIncrease / El Decrease: $ 133,724.31 <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 41,431.00 ❑ Scope of Work <br />"" 8 Differing Site Conditions, Changed Conditions <br />Current Percent of Change: 5 0 % ❑ Conflicted Specifications and Drawings <br />New Total ................w � .....�...._........_. <br />2,809,540.66 ❑ Failed Materials <br />Amount: $, _❑ Error <br />❑ Omission <br />Total Percent of Change: 6.65 % ❑ Final Quantity Adjustment <br />Funding Secured From:, 324-...!.°.5D- 46b-4Z-0 <br />(filled out by PM) <br />RECOMMENDED BY: <br />r <br />7 <br />Christopher Holth <br />Project Inspector (Print Name) (Sinatu (Date) <br />REVIEWED BY: <br />Toy Villa g <br />Construction Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Kyle Silveus <br />Engineering Project Manager (Print Name) (Sign re) (Date) <br />APPROVED BY: <br />Kara Boyles <br />City Engineer (Print Name) (S nttrr (Dt <br />
The URL can be used to link to this page
Your browser does not support the video tag.