My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Western Ave. Streetscape, Phase III Proj No 118-076 - Indiana Earth, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 2 - Western Ave. Streetscape, Phase III Proj No 118-076 - Indiana Earth, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:55:06 PM
Creation date
11/14/2019 10:29:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transfer machine for asphalt placement cost $5,390 <br />Sanitary Repair for 18" line at Lake Street going west was $26,460. No extra mob cost by Rieth Riley <br />but added temporary stone patch and maintenance. New total: $24,100. <br />18" of Sanitary pipe repair at manhole at Falcon Street and going east. $3,350 <br />Added bollard. Per line item $1000.00. <br />There will be 1 less of the storm catch basin and 2 less of the storm manhole line items. — ($8215.00) <br />COST ADJUSTMENTS TO NORTHSIDE OF WESTERN <br />Falcon Street <br />Pavement Removal 293.33 SYS @ 5.61= $1645.58 <br />HMA Base #880 = 80 TON @ 71.00 = $5680.00 <br />HMA Base #440 = 25 TON @ 71.00 = $1775.00 <br />53s 6" 75 TON @ 26.41= $1980.75 <br />Patching #880 = 25 TON @ 152.00 =-($3800.00) <br />Total = $7,281.33 <br />Lake Street <br />Pavement Removal 305 SYS @ 5.61= $1711.05 <br />HMA #440 = 109 TON @ 71.00 = $7739.00 <br />53s 6" = 125 TON @ 26.41= $3301.25 <br />Patching #880 = 75 TON @ 152.00=-($11,400.00) <br />Total = $1,351.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.